Flue gas output and air input 

 

 

For the installation of the flue gas output and air input material, we 
refer to the enclosed basic manual, or contact the manufacturer of 
the appropriate flue gas output and air input equipment for 
extensive technical information and specific assembly instructions.   

 

 

Make sure that the spigot and socket joints of the flue gas 
output and air input materials seal effectively and will not 
come loose. Not properly attaching the flue gas output and the 
air input can lead to dangerous situations or physical injury. 
Check all parts which transport flue gas or air for air tightness.       

 

5.5.1

 

Concentric connection 60/100 

The boiler is fitted with a flue gas adapter suitable for connecting to  
a concentric flue gas extractor system with a diameter of 60/100.  
 
1.

 

Fit the concentric pipe for the air supply and burning gas extraction in the adapter. 
The built-in gaskets ensure there is an air tight seal. 

 
 

5.5.2

 

Concentric connection 80/125 

If required, the flue gas adapter 60/100 can be replaced by a version 
for a flue gas extractor system with a 80/125 diameter. 
The conversion set for parallel connection can be ordered under EKHY090717. 
 
1.

 

Carefully follow the instruction as provided with the adapter set 80/125. 

2.

 

Fit the concentric pipe for the air supply and burning gas extraction in the adapter. 
The built-in gaskets ensure there is an air tight seal. 

 

5.5.3

 

Parallel connection 80/80 

 
If required, the flue gas adapter 60/100 can be replaced by a version 
for a parallel flue gas extraction system (2 pipes) with a 80 mm diameter. 
The conversion set for parallel connection can be ordered under EKHY090707. 
 
1.

 

Carefully follow the instruction as provided with the adapter set 80. 

2.

 

Fit the pipes for the air supply and burn gas extraction in the input and output of 
the unit. The built-in gaskets ensure there is an airtight seal. 

 

5.5.4

 

Materials to be used: 

Unit 
category 

Materials 

Supplier/Test standard 

C13 

Feedthrough 

Daikin  

Other parts 

Gastec QA or Daikin  

C33 

Feedthrough 

Daikin 

Feedthrough at the Prefab chimney 

Gastec QA, Daikin or third 
parties 

Other parts 

In accordance to applicable 
national or local legislation 

C43 

All materials 

Gastec QA or Daikin  

At the CLV system 

Gastec QA 

C53 

Inlet roster 

Daikin 

Other parts and exhaust hood 

Gastec QA or Daikin  

C63 

All materials and feedthrough 

Gastec QA 

 

Main channel 

Gastec QA 

Other parts 

Gastec QA or Daikin 

C83 

Inlet roster 

Daikin 

C93 

All materials 

Gastec QA or Daikin  

 

 

 

 
 
 
 
 
 
 
 
 
 

Summary of Contents for EKOMB22AAV1

Page 1: ...Daikin Europe NV EKOMB22AAV1 EKOMB28AAV1 EKOMB33AAV1 Installation instructions English...

Page 2: ...o las disposiciones de 06 secondo le prescrizioni per 07 08 de acordo com o previsto em 09 10 under iagttagelse af bestemmelserne i 11 enligt villkoren i 12 gitt i henhold til bestemmelsene i 13 nouda...

Page 3: ......

Page 4: ...ower 43 7 4 Setting pump setting 43 7 5 Weather dependent regulation 44 7 6 Conversion to different type of gas 45 7 7 Gas air regulation 45 7 8 Setting gas air regulation 46 8 Malfunctions 48 8 1 Sho...

Page 5: ...installation Symbols The following symbols are used in this manual CAUTION Procedures which if they are not carried out with the necessary care may cause damage to the product the surroundings the env...

Page 6: ...IP44 It is possible to use the unit solely for warm water or solely for heating The system which is not in use does not need to be connected see par 7 2 The unit is delivered for natural gas G20 as a...

Page 7: ...at an outdoor sensor or a combination thereof can be connected to the controller see par 10 1 When there is a heat request from a thermostat after the fan has started running code 3 the ignition will...

Page 8: ...ngle and the associated software This facility enables you to follow the behavior of the boiler controller the unit and the heat installation over a long period 2 5 Test programs There is an option in...

Page 9: ...ng panel N Connection block terminal strip X4 D Sensor S1 flow O Condensate drain pan E Sensor S2 return P Domestic hot water sensor S3 F Fan Q Siphon G Flow sensor R Heat exchanger H Pressure sensor...

Page 10: ...M AA B pack large EKFJL AA Valve kit EKVK4AA Cover plate EKCP1AA Outdoor sensor EKOSK1AA 3 way valve set EK3WV1AA Flue gas adapter Concentric 80x125 EKHY090717 Flue gas adapter Parallel 80 mm EKHY0907...

Page 11: ...pply CH G ext B Return CH G ext C Gas G int D Tap water cold G ext E Tap water warm G ext F Condense outlet dn25 flexible h 517mm EKOMB22AAV1 577mm EKOMB28AAV1 637mm EKOMB33AAV1 H 590mm EKOMB22AAV1 65...

Page 12: ...B pack A Supply CH G ext B Return CH G ext C Gas G int D Tap water cold G ext E Tap water warm G ext F Condense outlet dn25 flexible H 770mm EKOMB22AAV1 830mm EKOMB28AAV1 890mm EKOMB33AAV1 Z Flue gas...

Page 13: ...ide a cabinet ventilation openings of at least 50 cm2 are required 4 2 2 Removing cover plate and front panel For various activities on the unit the cover plate and front panel have to be removed from...

Page 14: ...The boiler can now be placed on the suspension strip simultaniously sliding the pipes of the boiler into the valves in the assembly bracket 4 3 2 Assembling B pack Make sure the construction of the wa...

Page 15: ...d loosen the two screws on the left and right of the display and remove the front panel 9 Assemble the flexible tube D onto the outlet of the siphon Fill the siphon with water and slide it as far as p...

Page 16: ...ration a non spring operated return valve must be assembled vertically 5 1 1 Thermostatic radiator taps If all radiators are fitted with thermostatic or cable radiator taps a minimum water circulation...

Page 17: ...ermostat to connector X4 6 7 in the unit See par 10 1 In this situation the pump in the boiler is used to bridge the loss of pressure of the underfloor heating system Using the loss of pressure graph...

Page 18: ...external heat source regulation may only be applied if no extra external boiler has to be heated up installation type 1 Installation instructions 1 Install the valve in accordance with the connection...

Page 19: ...r filled If the unit is switched off during winter and is disconnected from the electricity supply the sanitary water must be drained in order to prevent freezing To do so disconnect the tap water con...

Page 20: ...r plate A remove it to the front 3 Unscrew both screws 1 behind the display window 4 Slide the bottom of the front panel 2 forwards and remove it 5 Pull the boiler controller forward The boiler contro...

Page 21: ...rmostat menu One of the following codes will be shown on the display of the unit 1 rF and L the display above the button shows an L alternated by a red led flashing The CH boiler has not been appointe...

Page 22: ...should be used in combination with an on off room thermostat In principle any on off room thermostat can be combined with an outdoor sensor Upon request of the room thermostat the boiler will provide...

Page 23: ...arallel connection can be ordered under EKHY090717 1 Carefully follow the instruction as provided with the adapter set 80 125 2 Fit the concentric pipe for the air supply and burning gas extraction in...

Page 24: ...AAV1 10 m 10 m EKOMB33AAV1 10 m 10 m Permitted pipe lengths when applying concentric 80 125 C13 C33 C93 EKOMB22AAV1 29 m 29 m See par 5 6 13 EKOMB28AAV1 29 m 29 m See par 5 6 13 EKOMB33AAV1 29 m 29 m...

Page 25: ...as outlet pipe and the wall temperature at the end of the combustion gas outlet pipe Replacement lengths Bend 90 R D 1 2 m Bend 45 R D 1 1 m Knee 90 R D 0 5 4 m Knee 45 R D 0 5 2 m Calculation example...

Page 26: ...e system 5 6 6 Horizontal facade outlet double pipe feedthrough Unit category C13 CAUTION Pipes for the connection of the air supply and the combustion gas outlet between the unit and the double pipe...

Page 27: ...t is not on the edge of a building the air supply pipe does not need to be extended 1 Extend the combustion gas outlet pipe and possibly also the air supply pipe of the double pipe feedthrough with a...

Page 28: ...cluding the length of the combi feedthrough For concentric total pipe length excluding the length of the combi feedthrough Parallel Concentric 60 100 Concentric 80 125 EKOMB22AAV1 100 m 10 m 29 m EKOM...

Page 29: ...ed 3 Fit the exhaust roster and attach it to the inner pipe 4 Fit the combi feedthrough and combi extension pipe on a slope towards the unit Assembly of horizontal roof terminal 1 The outlet can be ma...

Page 30: ...22AAV1 100 m 11 m 29 m EKOMB28AAV1 85 m 10 m 29 m EKOMB33AAV1 80 m 10 m 29 m Combustion gas outlet and air supply pipe For assembly see par 5 6 5 General assembly Assembly vertical roof terminal 1 Fit...

Page 31: ...utlet 80 mm with Giveg exhaust hood onto a sloped roof at the location of the outlet 2 Fit a standard ventilation feedthrough 80 mm with rain cap in an associated roof feed though panel for the air su...

Page 32: ...er functioning of the prefab chimney in terms of wind damage ice forming raining in recirculation etc CAUTION The connection of the air supply and the combustion gas outlet between the unit and the pr...

Page 33: ...and air supply pipe For assembly see par 5 6 5 General assembly Horizontal air supply assembly The air supply A can be fitted at any place in the facade 1 At the location of the air supply create a gr...

Page 34: ...MB22AAV1 100 m EKOMB28AAV1 85 m EKOMB33AAV1 80 m The minimum diameters of the communal output system based on vacuum Flue tube diameter Number of units EKOMB22AAV1 EKOMB28AAV1 EKOMB33AAV1 2 110 130 13...

Page 35: ...et Air inlet Flue outlet Air inlet 2 135 253 135 214 155 291 155 246 3 157 295 157 249 166 311 166 263 4 166 311 166 263 176 330 176 279 5 175 328 175 278 186 349 186 295 6 184 345 184 292 196 367 196...

Page 36: ...or flexible with a maximum length of 25 meters When using plastic flue tube material a minimum temperature class of T120 applies The transfer bend between concentric and vertical flue connection in t...

Page 37: ...nstead of the manual aerator 4 Aerate the installation with the manual aerators on the radiators 5 Top up the CH installation if the pressure has dipped too low due to the aeration 6 Check all couplin...

Page 38: ...t and the radiators This should be approximately 20 C Set the maximum power on the service panel for this purpose see par 7 3 If necessary set the pump setting and or radiator shut off valves The stan...

Page 39: ...nse outlet from freezing the unit must be installed in a frost free room The unit is fitted with frost protection in order to prevent it from freezing If the temperature of the heat exchanger drops to...

Page 40: ...ch means the supply of domestic hot water takes a bit of time If there is no desire for domestic hot water or of immediate supply hereof the tap comfort function can be switched off Resetting Check th...

Page 41: ...f storage tank 2 hot water only 3 space heating only 2 CH pump continuous 0 0 0 0 post running pump only 1 pump continuously active 2 pump continuously active with external MIT switch 3 pump continuou...

Page 42: ...set maximum rpm propane 50 h Max rpm fan 100 rpm 45 46 46 Settings reach 40 50 EKOMB22AAV1 EKOMB28AAV1 and EKOMB33AAV1 This parameter can be used to set the maximum rpm n Regulated temperature during...

Page 43: ...7 4 Setting pump setting The switch to set the pump setting is located on the connection box of the CH pump Factory setting III 1 Set the pump setting depending on the set maximum power and the water...

Page 44: ...ture in accordance with the set fuel line The maximum leaving water temperature T max is set via the display If so desired the fuel line can be changed by using the service code see par 7 3 Fuel line...

Page 45: ...on 11 Now check the setting of the gas air ratio see par 7 8 12 Put a sticker of the configured gas type on top of the existing sticker at the gas block 13 Put a sticker of the configured gas type at...

Page 46: ...t for space heating 6 Select the High setting by twice pressing the and buttons simultaneously A capital letter H will appear on the service display The user display will show a Busy symbol Do NOT car...

Page 47: ...ontact your distributor 1 Remove the cap A which covers the adjuster screw 2 Turn the screw B to the right to increase the CO2 percentage and to the left to decrease it See the following table for the...

Page 48: ...lot of the pump shaft and turn the shaft Check the wiring between the pump and the boiler controller Too little flow in installation closed radiators pump setting too low 2 Switch S1 and S2 Check cabl...

Page 49: ...upply No Gas air regulation not configured correctly Yes Check the setting see gas air regulation No Boiler controller gasket faulty Yes Replace the boiler controller gasket No Boiler controller fault...

Page 50: ...amination in the exchanger installation Yes Rinse the exchanger installation on the side of the CH 8 3 6 No domestic hot water Possible causes Solution The service display shows nothing Yes Check whet...

Page 51: ...ather dependent regulation faulty or short circuited Yes Check the wiring Check OpenTherm and On off connection of the unit Replace the thermostat Replace the weather dependent regulation No CH instal...

Page 52: ...over the edge of the lower tray 5 Push down the condense outlet tray at the back from the connection to the heat exchanger 6 and remove it from the unit 9 Take the connector from the fan and the igni...

Page 53: ...the condense outlet tray by sliding it into the outlet stump of the switcher 1 with the siphon connection before the lower tray Then turn the condense outlet tray to the left 2 and push it down into...

Page 54: ...17 8 6 9 22 8 7 1 26 3 Nom output at 50 30 C kW 5 9 18 5 7 6 23 4 7 8 27 1 Max CH water pressure bar 3 Max CH water temperature C 90 Other data Gas consumption G25 m3 h 0 67 2 65 0 85 3 36 0 86 3 93...

Page 55: ...24Vdc and or frost thermostat 8 9 Outdoor sensor 12 kOhm 25 C 11 12 OpenTherm room thermostat 6 7 should be open Connector X2 230V 2 4 Mains supply 230 V 2 L brown 4 N blue 7 8 CH pump 8 L brown 7 N b...

Page 56: ...becomes void if it cannot be proven that the CH boiler has been subjected to maintenance by a certified installer at least once a year from the commissioning date The instructions for installation an...

Page 57: ...Daikin Europe NV 57...

Page 58: ...Daikin Europe NV 58...

Page 59: ...Daikin Europe NV 59...

Page 60: ...885517 4P374376 1A...

Reviews: