Daikin Europe NV
13
4.2
Installation space
The unit must be installed against a wall with sufficient load bearing capacity.
In case of light wall constructions, there is a risk of resonance noises.
Within 1 meter of the unit, there must be a earthed wall plug.
In order to prevent the condense outlet from freezing, the unit must be installed in
a frost-free room. Preferably ensure there is a space of at least 2 cm next to the
boiler. No free space is required due to danger of singeing.
4.2.1
Installing in kitchen cabinet
The unit can be placed between two kitchen cabinets, or inside a kitchen cabinet.
Make sure there is sufficient ventilation at the bottom and the top.
If the unit is installed inside a cabinet, ventilation openings of at least 50 cm
2
are
required.
4.2.2
Removing cover plate and front panel
For various activities on the unit, the
cover
plate and front panel have to be
removed from the unit, if they were installed. Do this as follows:
•
If you are using the
cover
plate (A), remove it to the front.
•
Unscrew both screws (1) behind the display window.
•
Pull the bottom of the front panel (2) forwards.
Danger: risk of burning
In case of high leaving water set ponts for space heating (eighter a high fixed set
point or a high weather-dependent set point at low ambient temperatures), the
heat exchanger of the boiler can be very hot, for example 70°C.
Beware that in case of a tapping demand, the water can initially have a higher water
temperature than requested.
In this case, it is recommended to install a thermostatic valve to prevent scalding.
This can be done according to the schematics below.
Summary of Contents for EKOMB22AAV1
Page 1: ...Daikin Europe NV EKOMB22AAV1 EKOMB28AAV1 EKOMB33AAV1 Installation instructions English...
Page 3: ......
Page 57: ...Daikin Europe NV 57...
Page 58: ...Daikin Europe NV 58...
Page 59: ...Daikin Europe NV 59...
Page 60: ...885517 4P374376 1A...