Commissioning
EN
13
ECOLLECTRMX
6
Commissioning
6.1
Commissioning the product
1. Connect a hose to the boiler
filling and drain valve KFE
(5).
2. Open the hand wheel (4) for
filling and flushing.
3. Open the return valve (1) of
the first heating circuit.
4. Slightly open the flow valve
(3) of the first heating circuit.
5. Close all other valves (2).
6. Fill the heating circuit with a
maximum of 5 bar and flush
it.
7. Fully open the flow valve (3)
as soon as water flows into
the heating circuit.
8. Close the flow valve and the
return valve of the filled
heating circuit.
9. Vent the system by opening
the vent valve (6).
10.Repeat this procedure for all
other heating circuits.
5
4
1
2
5
6
3
Summary of Contents for ECOLLECTRMX
Page 1: ......
Page 2: ......
Page 3: ......
Page 11: ...Product description EN 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 mm ...
Page 19: ......
Page 27: ...Produktbeschreibung DE 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 mm ...
Page 43: ...Description du produit FR 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 mm ...
Page 59: ...Productbeschrijving NL 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 mm ...
Page 75: ...Descrizione del prodotto IT 9 ECOLLECTRMX 220 mm 30 mm 46 mm 79 mm 327 mm ...
Page 91: ...Descrição do produto PT 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 mm ...
Page 99: ......
Page 107: ...Opis proizvoda HR 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 m ...
Page 115: ......
Page 123: ...Opis izdelka SL 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 m ...
Page 131: ......
Page 132: ...008 1705799 00 03 2020 Copyright Daikin 900 200 0499 ...