Commissioning
EN
14
ECOLLECTRMX
6.2
Performing the pressure test and the function test
1. Perform a pressure test with 6 bar.
- The system pressure must remain constant for at least two hours (max-
imum pressure drop 0.2 bar).
2. Perform a leak test after the two hours have passed.
3. Fill the system with water until the operating pressure is reached.
6.3
Adjusting the flow valves
1. Open the flow valve at the red
adjustment ring until the calcu-
lated water volume is indicated at
the flow meter (1).
2. Pull the white adjustment ring up
to unlock.
1
Summary of Contents for ECOLLECTRMX
Page 1: ......
Page 2: ......
Page 3: ......
Page 11: ...Product description EN 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 mm ...
Page 19: ......
Page 27: ...Produktbeschreibung DE 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 mm ...
Page 43: ...Description du produit FR 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 mm ...
Page 59: ...Productbeschrijving NL 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 mm ...
Page 75: ...Descrizione del prodotto IT 9 ECOLLECTRMX 220 mm 30 mm 46 mm 79 mm 327 mm ...
Page 91: ...Descrição do produto PT 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 mm ...
Page 99: ......
Page 107: ...Opis proizvoda HR 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 m ...
Page 115: ......
Page 123: ...Opis izdelka SL 9 ECOLLECTRMX 327 mm 220 mm 30 mm 46 mm 79 m ...
Page 131: ......
Page 132: ...008 1705799 00 03 2020 Copyright Daikin 900 200 0499 ...