Lifting, Off Loading and Handling
Care should be taken during all handling of equipment to prevent damage. Estimated
weights of shipped sections are shown on the General Arrangement (GA) drawings.
The actual weight of the shipped sections is labelled on the polythene sheeting
It is recommended that if the units are shipped on wooden pallets that they are left in
place until the units have been correctly sited. This will help prevent site damage and
will aid handling. If this recommendation is not adhered to then it is not
Daikin Applied
(UK) Ltd’s
responsibility for any damage caused to the units.
1) All work must be in accordance with the Health and Safety at Work Act 1974,
relevant H.S.E. Guidance Notes and Codes of Practice. When cranes are used it is
recommended that the requirements of BS 7121 be observed.
Diagram 1 -
Shows the lifting items required when lifting by crane.
Lifting, Off Loading and Handling (continued)