Safety Information
All Electrical work carried out on the Air Handling Units, must be in accordance with
the Manufacturers instructions and relevant codes & practices.
All work carried out on, or in, the Air Handling Units must be in accordance with the
client’s permit to work system.
Before starting the Air Handling Units for the first time ensure that all earthing bonds
have been made and securely fastened.
Before working on, or in, the Air Handling Units, ensure that all electrical connections
have been isolated and isolators padlocked in the
OFF
position.
Safety Information (continued)
Before starting the Air Handling Units, ensure that all access doors and panels are
closed and clamped shut.
When work is required inside the Air Handling Units allow at least two (2) minutes
after switching the power off before entering the Air Handling Units. This is to ensure
that all rotating parts have come to a rest.
Do not remove any drive guards unless the equipment is isolated and stationary.
Ensure that all guards are correctly replaced and secured before restarting the Air
Handling Units.
Disposal of Redundant Materials
All redundant materials must be disposed of in accordance with the relevant local and
national environmental regulations.