Figure 3: Roof Curb Assembly (DPS 007–015)
1
A
F
D
B
C
E
A
E
RETURN
AIR
SUPPLY
AIR
FRONT SIDE
RIGHT SIDE
BACK SIDE
LEFT SIDE
NOTE:
1. Check submittal drawing for gas/water/electrical/supply/return air opening
Horizontal above the roof gas connection only
Standard Roof Curb – Medium Cabinet
DPS 007–012 Roofcurb with ERW Certifi ed Drawing
McQuay International certifi es that its equipment will conform to this drawing and McQuay’s
published specifi cations, subject to its published warranty. Purchaser must determine that the
equipment is fi t and suffi cient for the job specifi cations. No change to this drawing may be made
unless approved in writing by McQuay .
www.DaikinMcQuay.com
© 2012 McQuay International
Model:
DPS
Date:
Unit Tag:
Units:
Sheet:
__
of
__
Curb Detail
A–A
2
"×
4
"
Nailer
A
A
2.0"
Typ.
4.0"
14.0"
or
24.0"
34 .88
Inside
48 .38
Inside
81 .5
Inside
13 .5
Inside
30 .5
Inside
Supply
Opening
Return
Opening
Electrical
Entrance
24 .25
2 .0
3 .4
6 .9
8 .8
Roof Curb for ERW – Medium Cabinet
DPS 007–012 Roofcurb with ERW Certifi ed Drawing
McQuay International certifi es that its equipment will conform to this drawing and McQuay’s
published specifi cations, subject to its published warranty. Purchaser must determine that the
equipment is fi t and suffi cient for the job specifi cations. No change to this drawing may be made
unless approved in writing by McQuay .
www.DaikinMcQuay.com
© 2012 McQuay International
Model:
DPS
Date:
Unit Tag:
Units:
Sheet:
__
of
__
Curb Detail
A–A
2
"×
4
"
Nailer
A
A
2.0"
Typ.
4.0"
14.0"
or
24.0"
34 .88
Inside
48 .38
Inside
101 .5
Inside
13 .5
Inside
30 .5
Inside
Supply
Opening
Return
Opening
Electrical
Entrance
20 .0
24 .25
2 .0
3 .4
6 .9
8 .8
IM 1125-7 • REBEL ROOFTOPS
8
www.DaikinApplied.com
M
eChanICal
I
nsTallaTIon
Summary of Contents for DPS005
Page 109: ...IM 1125 7 109 Addendum follows...