background image

30

P

ROPANE

 G

AS

 T

ANKS

 

AND

 P

IPING

I

F

 

THE

 

GAS

 

FURNACE

 

IS

 

INSTALLED

 

IN

 

A

 

BASEMENT

AN

 

EXCAVATED

 

AREA

 

OR

 

CONFINED

 

SPACE

IT

 

IS

 

STRONGLY

 

RECOMMENDED

 

TO

 

CONTACT

 

A

 

PROPANE

 

SUPPLIER

 

TO

 

INSTALL

 

A

 

GAS

 

DETECTING

 

WARNING

 

DEVICE

 

IN

 

CASE

 

OF

 

A

 

GAS

 

LEAK

.

S

INCE

 

PROPANE

 

GAS

 

IS

 

HEAVIER

 

THAN

 

AIR

ANY

 

LEAKING

 

GAS

 

CAN

   

SETTLE

 

IN

 

ANY

 

LOW

 

AREAS

 

OR

 

CONFINED

 

SPACES

.

P

ROPANE

 

GAS

 

ODORANT

 

MAY

 

FADE

MAKING

 

THE

 

GAS

 

UNDETECTABLE

   

EXCEPT

 

WITH

 

A

 

WARNING

 

DEVICE

.

• 

• 

WARNING

A gas detecting warning system is the only reliable way to detect
a propane gas leak. Rust can reduce the level of odorant in
propane gas.  Do not rely on your sense of smell.  Contact a local
propane gas supplier about installing a gas detecting warning
system.  If the presence of gas is suspected, follow the instruc-
tions listed in the 

Safety Precautions

 section of this manual.

All propane gas equipment must conform to the safety stan-
dards of the National Board of Fire Underwriters, NBFU Manual
58.
For satisfactory operation, propane gas pressure must be 10”
WC + .5”  WC at the furnace manifold with all gas appliances in
operation. Maintaining proper gas pressure depends on three
main factors:
1. Vaporization rate, depending on temperature of the

liquid, and “wetted surface” area of the container or
containers.

2. Proper pressure regulation. (Two-stage regulation is

recommended for both cost and efficiency).

3. Pressure drop in lines between regulators, and be-

tween second stage regulator and the appliance. Pipe
size will depend on length of pipe run and total load of
all appliances.

Complete information regarding tank sizing for vaporization,
recommended regulator settings, and pipe sizing is available
from most regulator manufacturers and propane gas suppliers.
Use only pipe dope approved for both L.P. and natural gases.
Refer to the following illustration for typical propane gas instal-
lations and piping.

200 PSIG
Maximum

5 to 15 PSIG
(20 PSIG Max.)

Continuous

11" W.C.

Second Stage
Regulator

First Stage
Regulator

Propane Gas Installation (Typ.)

3/8"

1/2"

5/8"

3/4"

7/8"

1/2"

3/4"

10

730

1,700

3,200

5,300

8,300

3,200

7,500

20

500

1,100

220

3,700

5,800

2,200

4,200

30

400

920

2,000

2,900

4,700

1,800

4,000

40

370

850

1,700

2,700

4,100

1,600

3,700

50

330

770

1,500

2,400

3,700

1,500

3,400

60

300

700

1,300

2,200

3,300

1,300

3,100

80

260

610

1,200

1,900

2,900

1,200

2,600

100

220

540

1,000

1,700

2,600

1,000

2,300

125

200

490

900

1,400

2,300

900

2,100

150

190

430

830

1,300

2,100

830

1,900

175

170

400

780

1,200

1,900

770

1,700

200

160

380

730

1,100

1,800

720

1,500

Pipe or
Tubing
Length

Feet

Tubing Size, O.D. Type L

Nominal Pipe Size

Schedule 40

Sizing Between First and Second Stage Regulator*

Maximum Propane Capacities listed are based on 2 psig pressure drop at 10 psig setting.
Capacities in 1,000 BTU/hour.

To convert to capacities at 15 psig settings - multiply by 1.130
To convert to capacities at 5 psig settings - multiply by 0.879

Propane Gas Piping Chart I

3/8"

1/2"

5/8"

3/4"

7/8"

1/2"

3/4"

1"

1-1/4" 1-1/2"

10

39

92

199

329

501

275

567

1,071 2,205

3,307

20

26

62

131

216

346

189

393

732

1,496

2,299

30

21

50

107

181

277

152

315

590

1,212

1,858

40

19

41

90

145

233

129

267

504

1,039

1,559

50

18

37

79

131

198

114

237

448

913

1,417

60

16

35

72

1,211

187

103

217

409

834

1,275

80

13

29

62

104

155

89

185

346

724

1,066

100

11

26

55

90

138

78

162

307

630

976

125

10

24

48

81

122

69

146

275

567

866

150

9

21

43

72

109

63

132

252

511

787

200

8

19

39

66

100

54

112

209

439

665

250

8

17

36

60

93

48

100

185

390

590

Tubing Size, O.D. Type L

Nominal Pipe Size

Schedule 40

Pipe or
Tubing
Length

Feet

*Data in accordance with NFPA pamphlet No. 54

Sizing Between Second or Second Stage Regulator & Appliance*

Maximum Propane Capacities listed are based on 1/2" W.C. pressure drop at 11" W.C. setting.
Capacities in 1,000 BTU/hour.

Propane Gas Piping Chart II

Circulating Air & Filters

D

UCT

 

WORK

 - A

IR

 F

LOW

N

EVER

 

ALLOW

 

THE

 

PRODUCTS

 

OF

 

COMBUSTION

INCLUDING

 

CARBON

 

MONOXIDE

TO

 

ENTER

 

THE

 

RETURN

 

DUCT

 

WORK

 

OR

 

CIRCULATION

 

AIR

 

SUPPLY

.

WARNING

Duct systems and register sizes must be properly designed for
the CFM and external static pressure rating of the furnace. De-
sign the ductwork in accordance with the recommended meth-
ods of  “Air Conditioning Contractors of America” Manual D.
Install the duct system in accordance with Standards of the Na-
tional Board of Fire Underwriters for the Installation of Air Con-
ditioning, Warm Air Heating and Ventilating Systems. Pamphlets
No. 90A and 90B.

OPERATION

Summary of Contents for DM97MC

Page 1: ...mber 2016 This manual is to be used by qualified professionally trained HVAC technicians only Daikin does not assume any responsibility for property damage or personal injury due to improper service p...

Page 2: ...ERTY DAMAGE PERSONAL INJURY OR DEATH IMPORTANT INFORMATION 2 4 PRODUCT IDENTIFICATION 5 8 ACCESSORIES 9 11 LIGHTING INSTRUCTIONS 12 PRODUCT DESIGN 13 24 OPERATION 25 47 SERVICE AND OPERATION 48 OPERAT...

Page 3: ...r assistance please contact CONSUMER INFORMATION LINE DAIKIN BRAND PRODUCTS TOLL FREE 1 855 770 5678 U S only email us at customerservice daikincomfort com fax us at 731 856 1821 Not a technical assis...

Page 4: ...El mon xido de carbono puede causar enfermedades severas como da o cerebral permanente muerte Las emisiones de mon xido de carbono pueden circular a trav s del aparato cuando se opera en cualquier mo...

Page 5: ...NOMINAL INPUT 060 60 000 Btuh 080 80 000 Btuh 100 100 000 Btuh 120 120 000 Btuh AIRFLOW CAPABILITY 0 5 ESP 3 1200 4 1600 5 2000 CABINET WIDTH B 17 1 2 C 21 D 24 1 2 ADDITIONAL FEATURES N Natural Gas...

Page 6: ...tainless Steel Accessory Terminals EAC terminal HUM IN HUM OUT terminals Gas Line Entry Left or Right Revision Attributes First revision of 34 5 modulating up flow furnace MODEL DC97MC REV AA Equipmen...

Page 7: ...A Communicating Thermostat Kit Digitally communicating touchscreen thermostat a necessary part of any communicating system Designed for use with compatible Daikin Air Handlers or Furnaces and outdoor...

Page 8: ...97 upflow variable speed MVM 34 5 modulating gas furnaces This kit is intended to provide a location external to the furnace casing for installation of a permanent filter The rack is mounted over the...

Page 9: ...X DM97MC1205DN X X X X X X X X DC9 7MC060 3BN X X X X X X X X X DC9 7MC080 3BN X X X X X X X X X DC9 7MC080 4CN X X X X X X X X X DC9 7MC1005 CN X X X X X X X X Model Number 0170K00000S 0170K00001S D...

Page 10: ...vertical or horizontal vent termination The illustrations give a brief view of the kit and its application Vent Combustion Air Flush to 1 maximum 45 Elbow Field Supplied Combustion Air Vent Strap Fie...

Page 11: ...P gas as well as a set of 1 25 mm orifices to replace the factory installed natural gas orifices Do not attempt to convert a modulating furnace gas valve Factory burners are suit able for both gases L...

Page 12: ...r de gaz thislabel d allumer le br leurmanuellement ON MARCHE MANUEL EN POS explosionmayresultcausingproperty renifler tout autour del appariel pour dec ler OFF ARRET corporelles oulapertede vies huma...

Page 13: ...PPLIER WARNING IF THE INFORMATION IN THESE INSTRUCTIONS IS NOT FOLLOWED EXACTLY A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE PERSONAL INJURY OR LOSS OF LIFE DO NOT STORE OR USE GASOLINE OR O...

Page 14: ...TO FIRE DO NOT INSTALL THIS FURNACE IN A MOBILE HOME TRAILER OR RECREATIONAL VEHICLE WARNING Introduction This is a Category lV furnace This furnace uses a pressur ized venting system and must be ins...

Page 15: ...inlet pipe is optional and the furnace can be vented as a Non direct vent single pipe central forced air furnace in which combustion air is taken from the installation area or from air ducted from th...

Page 16: ...erfreezeprotection Referto Condensate Drain Lines and Trap for further details Ensure adequate combustion air is available for the fur nace Improper or insufficient combustion air can ex pose building...

Page 17: ...Furnace Components Heat Exchanger Assembly The primary heat exchanger is a tubular type constructed of high quality steel 409 stainless steel for the heat ex changer assembly consists of primary and s...

Page 18: ...the IFC Aux Terminals Located next to the low voltage connector there are two terminals labeled aux in aux out A factory jumper is installed between these two terminals As an op tion the jumper may b...

Page 19: ...USTIBLE MATERIALS INCHES NOTES For servicing or cleaning a 24 front clearance is required Unit connections electrical flue and drain may necessitate greater clearances than the minimum clearances list...

Page 20: ...ces Installation Positions DM97MC models may be installed up flow or horizontally with left or right side down DC97MC models may be in stalled down flow or horizontally with left or right side down Do...

Page 21: ...e an L P gas valve and a set of gas orifices Do not change or adjust the gas valve regulator springs H igh Stage Lo w Stage Natural None 451 3 5 w c 1 w c None Propane LPM 09 1 25M M 2 1 0 0 w c 2 6 w...

Page 22: ...55 50 45 40 35 30 25 3 120 113 106 99 92 85 78 71 2 or 2 1 2 40 35 30 25 20 15 10 5 3 103 96 89 82 75 68 61 54 DC97MC1005CNA DM97MC0804CNA DM97MC1005CNA DM97MC1205DNA DC97MC0603BNA DC97MC0803BNA DC97M...

Page 23: ...corner G Clearance to inside corner H Clearance to each side of center line extended above meter regulator assembly 3 ft 91 cm within a height 15 ft 4 5 m above the meter regulator assembly OTHER THA...

Page 24: ...eezing within the drain line If an air conditioning coil is installed with the furnace a common drain may be used An open tee must be in stalled in the drain line near the cooling coil to relieve posi...

Page 25: ...ELECTRIC CODE WARNING Line voltage connections can be made through either the right or left side panel The furnace is shipped configured for a right side electrical connection To make electrical conne...

Page 26: ...tacts the furnace will be disabled until the condition is cor rected These are 24 volt terminals fed internally do not apply another voltage source to these terminals R Y C NEU Furnace Integrated Con...

Page 27: ...re may not be present on all dehumidistats 5 Turn ON power to furnace Toenablethedehumidifyfunctionontheintegratedcontrolmod ule set the dehumidification ENABLE DIP switch from OFF to ON Once the swit...

Page 28: ...THE INLET GAS SUPPLY PRESSURE MUST BE AS SPECIFIED ON THE UNIT RATING PLATE WITH ALL OTHER HOUSEHOLD GAS FIRED APPLIANCES OPERATING Inletgassupplypressuresmustbemaintainedwithintheranges specified in...

Page 29: ...5 in lbs ex cessive over tightening may damage the gas valve Install a manual shutoff valve between the gas meter and unit within six feet of the unit If a union is installed the union must be downstr...

Page 30: ...2 000 2 900 4 700 1 800 4 000 40 370 850 1 700 2 700 4 100 1 600 3 700 50 330 770 1 500 2 400 3 700 1 500 3 400 60 300 700 1 300 2 200 3 300 1 300 3 100 80 260 610 1 200 1 900 2 900 1 200 2 600 100 22...

Page 31: ...manometer to measure the static pressure of the return duct at the inlet of the furnace Negative Pressure 2 Measure the static pressure of the supply duct Posi tive Pressure 3 The difference between...

Page 32: ...lyby the installer Filters must comply with UL900 or CAN ULCS111 standards Damage or repairs due to the installation of the furnace without filters is not covered under the warranty On upflow units gu...

Page 33: ...ty Single or double digit displayed CFM X 100 MIN 57 78 80 100 IGNITION UNIT CALL FOR HEAT ENDS 10 MINS 8 MINS 2 MINS Operation with Conventional 1 Stage Thermostat DIP switch selections 1 Stage heat...

Page 34: ...Light Off Sequence After the successful Light Off Sequence and expiration of the Ignition Stabili zation Period The IFC adjusts to the low firing rate After 2 minutes the IFC accepts the specific Heat...

Page 35: ...playing Ft the display will revert back to normal 4 Measure furnace gas supply pressure with burners firing Supply pressure must be within the range specified in the Inlet Gas Supply Pressure table Na...

Page 36: ...d check out an installed appliance by bringing the furnace up to High fire 100 input by passing the normal modulating routine To enter Field Test Mode the Fault Recall Push Button must be pressed twic...

Page 37: ...the Specifica tion Sheet applicable to your model Determine and adjust temperature rise as follows 1 Operate furnace with burners firing for approxi mately ten minutes Ensure all registers are open an...

Page 38: ...or blower also offers several custom ON OFF ramping profiles These profiles may be used to enhance cooling performance and increase comfort level The ramping profiles are selected us ing DIP switches...

Page 39: ...correct setting for a conventional single stage stat or a CTK02 CTK03 and CTK04 communicating modulating stats To use a conven tional two stage heating thermostat or a CTK01 thermo stat move this swi...

Page 40: ...ds OFF ON 180 Seconds ON ON 1 Stage Stat OFF 2 Stage Stat ON 1 Stage Compressor OFF 2 Stage Compressor ON Disabled OFF Enabled ON Disabled OFF Enabled ON Disabled OFF Enabled ON Disabled OFF Enabled O...

Page 41: ...230VACto 24VAC transformer must be installed in the outdoor unit to pro vide24VACpowertotheoutdoorunit selectroniccontrol The transformer is included with the CTK01AA CTK03 and CTK04 kits See kit inst...

Page 42: ...the IFC closes the humidifier relay contacts except from the calibration routine where the humidifier relay con tacts are always open HUMIDIFIER OUTPUT COMMUNICATING THERMOSTAT One set of isolated re...

Page 43: ...ommunicating single stage thermostat The ComfortNet system is a system that includes a ComfortNet compatible furnace and air conditioner or heat pump with a CTK0 thermostat A valid ComfortNet system c...

Page 44: ...ough a calibration routine During the cali bration routine the IFC runs the induced draft blower at different speeds to determine the opening and closing points of the pressure switches It records thi...

Page 45: ...ssure switch setting Ignition Firing Rate The target firing rate at which the appliance always lights off The appliance stays at this firing rate until the Ignition Stabilization Pe riod expires It th...

Page 46: ...l reset rollout switch circuit opens during a heating cycle The valve is immediately de energized The inducer will run for the Post purge period at its current speed If the circulator fan is on it wil...

Page 47: ...losed calibration will not be completed and the ap propriate error code will be logged and displayed Hot Surface Igniter Operation The IFC energizes a relay to control the line voltage Hot Surface Ign...

Page 48: ...nnector of the diagnostic tool to the end bell communicating connector Attach one of the alligator clips of the diagnostic tool to the 24 volt hot terminal of the furnace transformer and the other all...

Page 49: ...y Use 45 elbows rather than 90 elbows when possible Must not sag or otherwise trap condensate Use longest radius fittings possible If using 3 venting make the transition from 2 to 3 as close as practi...

Page 50: ...again Safety Circuit Description A number of safety circuits are employed to ensure safe and proper furnace operation These circuits serve to control any potential safety hazards and serve as inputs...

Page 51: ...pipe system Check for blockage and or leakage Check the outside termination and the connections at and internal to the furnace Heat exchanger Check for corrosion and or buildup within the heat exchang...

Page 52: ...CONTROL 55 S 303 INDUCED DRAFT BLOWER MOTOR 55 S 304 MODULATING GAS VALVE CHECK ADJUSTMENT 55 S 304A CHECKING INDUCTOR COIL 56 SERVICING S 305 CHECKING MAIN BURNERS 57 S 306 CHECKING ORIFICES 57 S 307...

Page 53: ...RING DISCONNECT ALL POWER BEFORE SERVICING WARNING 1 Check wiring visually for signs of overheating dam aged insulation and loose connections 2 Use an ohmmeter to check continuity of any suspected ope...

Page 54: ...ter completing check and or replacement of trans former and check and or repair of control circuit re install blower compartment door 8 Turn on electrical power and verify proper unit opera tion S 300...

Page 55: ...re is being called for The power wires are colored red white and black A green colored ground wire is also present S 304 MODULATING GAS VALVE CHECK ADJUSTMENT Modulating furnaces use a 24 VAC pneumati...

Page 56: ...the appropriate range shown below If manifold pressure is found to be within the acceptable range do not adjust gas valve Natural Gas Minimum 9 w c Maximum 1 2 w c L P Gas Minimum 2 6 w c Maximum 3 3...

Page 57: ...being consumed Orifices should be treated with care in order to prevent damage They should be removed and installed with a box end wrench in order to prevent distortion In no instance should an orifi...

Page 58: ...w c Propane Gas 10 0 w c Manifold Gas Pressure S 308 CHECKING HOT SURFACE IGNITOR Modulating furnaces use a 115 volt silicon nitride hot sur face igniter This is the familiar and reliable 0131F00008S...

Page 59: ...SERVICE LISTED BELOW WARNING The ground wire must run from the furnace all the way back to the electrical panel Proper grounding can be con firmed by disconnecting the electrical power and measur ing...

Page 60: ...inuously monitored by the IFC The flame rod flame rod wire and proper grounding are all critical to proving the presence of flame Because of the design of the Honeywell flame proving system reading fl...

Page 61: ...01 0130F00482 DM97MC0804CNAA 0 10 05 0 25 0130F00481 0 17 05 0 32 0 86 05 1 01 0130F00482 DM97MC1005CNAA 0 10 05 0 25 0130F00481 0 17 05 0 32 0 86 05 1 01 0130F00483 DM97MC1205DNAA 0 10 05 0 25 0130F...

Page 62: ...ary Make sure furnace is draining properly Replaceor realign igniter Check flame sense signal Clean sensor if coated and or oxidized Check flue piping for blockage proper length elbows and termination...

Page 63: ...et thermostat scrolls Check Furnace message EC x Inducer motor overcurrent fault INDUCER FAULT OR INDUCER LOCKOUT EC x Lingering Inducer motor overcurrent detected x Reset system power and verify indu...

Page 64: ...cessary x Inspect flue and or inlet air piping for blockage proper length elbows and termination Check drain system Correct as necessary x Check induced draft blower performance Correct as necessary x...

Page 65: ...has lost communications with circulator blower motor MOTOR COMM b1 x Loose wiring connection at circulator motor control leads x Failed circulator blower motor x Failed integrated control module x Tig...

Page 66: ...omfortNet thermostat Call for Service icon illuminated x ComfortNet thermostat scrolls Check Furnace message b6 x Circulator blower motor shuts down for over or under voltage condition x Circulator bl...

Page 67: ...GE COMPRESSOR COOLING WITH DEHUMIDIFICATION WHEN 2 STAGE COMPRESSOR IS SET UP d4 INVALID MEMORY CARD DATA dF DEFROST DEMAND E0 LOCKOUT DUE TO EXCESSIVE RETRIES OR RECYCLES E1 LOW STAGE PRESSURE SWITCH...

Page 68: ...15 VAC 1 POWER SUPPLY WITH POWER BEFORE SERVICING WIRING TO UNIT MUST BE TO UNIT MUST BE PROPERLY POLARIZED EQUIPMENT GND FIELD SPLICE SWITCH TEMP SWITCH PRESSURE PROT DEVICE LOW VOLTAGE FIELD LOW VOL...

Reviews: