background image

5

3. Lift unit per the “Rigging Details” section of this manual,

observing all warnings and cautions.  When unit is lifted,
boards and shipping brace will drop if screws have been
removed.  To avoid injury, STAND CLEAR.

4.  Dispose of the boards and brace appropriately.

Curb installations must comply with local codes and should be done
in accordance with the established guidelines of the National Roof-
ing Contractors Association.

Proper unit installation requires that the roof curb be firmly and
permanently attached to the roof structure.  Check for adequate
fastening method prior to setting the unit on the curb.

Full perimeter roof curbs are available from the factory and are
shipped unassembled. Field assembly, squaring, leveling and
mounting on the roof structure are the responsibility of the in-
stalling contractor.   All required hardware necessary for the as-
sembly of the sheet metal curb is included in the curb accessory.

T

O

 

PREVENT

 

POSSIBLE

 

EQUIPMENT

 

DAMAGE

PROPERTY

 

DAMAGE

PERSONAL

 

INJURY

 

OR

 

DEATH

THE

 

FOLLOWING

 

BULLET

 

POINTS

 

MUST

 

BE

 

OBSERVED

 

WHEN

 

INSTALLING

 

THE

 

UNIT

.

WARNING

Sufficient structural support must be determined prior to
locating and mounting the curb and package unit.

Ductwork must be constructed using industry guidelines.
The duct work must be placed into the roof curb before
mounting the package unit. Our full perimeter curbs
include duct connection frames to be assembled with the
curb.  Cantilevered type curbs are not available from the
factory.

Curb insulation, cant strips, flashing and general roofing
material are furnished by the contractor.

The curbs must be supported on parallel sides by roof members.
The roof members must not penetrate supply and return duct
opening areas as damage to the unit might occur.

NOTE: The unit and curb accessories are designed to allow vertical
duct installation before unit placement.  Duct installation after unit
placement is not recommended.

A

LL

 

CURBS

 

LOOK

 

SIMILAR

. T

O

 

AVOID

 

INCORRECT

 

CURB

 

POSITIONING

CHECK

 

JOB

 

PLANS

 

CAREFULLY

 

AND

 

VERIFY

 

MARKINGS

 

ON

 

CURB

 

ASSEMBLY

. I

NSTRUCTIONS

 

MAY

 

VARY

 

IN

 

CURB

 

STYLES

 

AND

 

SUPERSEDES

 

INFORMATION

 

SHOWN

.

CAUTION

See the manual shipped with the roof curb for assembly and in-
stallation instructions.

CLEARANCES

36”; minimum
roof overhang

48” Min

.

65”

Min.*

48”

Min.

48”

Min.*

*In situations that have multiple units, a 48” minimum clearance is
required between the condenser coils.

UNIT CLEARANCES

Adequate clearance around the unit should be kept for safety, ser-
vice, maintenance, and proper unit operation.  A total clearance
of 75” around this unit is recommended to facilitate possible blower
assembly, shaft, wheel replacement, coil, heat exchanger, electric
heat and gas furnace removal. This unit must not be installed be-
neath any obstruction. This unit should be installed remote from
all building exhausts to inhibit ingestion of exhaust air into the
unit’s fresh air intake.

Insulated
Panels

Roof Curb Installation

Summary of Contents for DDC Series

Page 1: ...Installation and Maintenance Manual IM 1216 Group Applied Air Systems Part Number IM 1216 Date January 2014 Light Commercial Packaged Heating and Cooling Units DCC Series 15 20 Tons...

Page 2: ...ngle package heating and cooling units See the Specification Sheet applicable to your model for information regarding accessories NOTE Please contact your distributor or our website for the applicable...

Page 3: ...Top Duct Connections 6 Rigging Details 6 Electrical Wiring 7 Circulating Air and Filters 9 Condensate Drain Connection 9 Startup Adjustments and Checks 9 Airflow Adjustments 10 Motor Sheave Adjustment...

Page 4: ...SENT FAILURE TO DO SO MAY CAUSE PROPERTY DAMAGE PERSONAL INJURY OR DEATH WARNING WARNING TO PREVENT THE RISK OF PROPERTY DAMAGE PERSONAL INJURY OR DEATH DO NOT STORE COMBUSTIBLE MATERIALS OR USE GASOL...

Page 5: ...e claim with the following supporting documents a Original Bill of Lading certified copy or indemnity bond b Original paid freight bill or indemnity in lieu thereof c Original invoice or certified cop...

Page 6: ...of this area This 36 clearance must also be maintained to insure proper combustion air flow The combustion air intake must not be blocked for any reason including blockage by snow Adequate clearances...

Page 7: ...rbs include duct connection frames to be assembled with the curb Cantilevered type curbs are not available from the factory Curb insulation cant strips flashing and general roofing material are furnis...

Page 8: ...Lifting cables should be attached to the unit with shackles The distance between the crane hook and the top of the unit must not be less than 60 Two spreader bars must span over the unit to prevent da...

Page 9: ...T TO PREVENT WATER ENTRY INTO THE BUILDING CAUTION For unit protection use a fuse or HACR circuit breaker that is in excess of the circuit ampacity but less than or equal to the maxi mum overcurrent p...

Page 10: ...t be weatherproof All holes in the unit base must be sealed including those around conduit nuts to prevent water leakage into build ing All required conduit and fittings are to be field supplied Suppl...

Page 11: ...CHECKS HIGH VOLTAGE OND THE FRAME OF THIS UNIT TO THE BUILDING ELECTRICAL GROUND BY USE OF THE GROUNDING TERMINAL PROVIDED OR OTHER ACCEPTABLE MEANS DISCONNECT ALL POWER BEFORE SERVICING OR INSTALLIN...

Page 12: ...d to a piece of equip ment for the purpose of designating its voltage class and for the purpose of defining the minimum and maximum voltage at which the equipment will operate Utilization Voltage The...

Page 13: ...ly force to the center of the span t Span length inches C Center distance inches D Larger sheave diameter inches d Smaller sheave diameter inches h Deflection height inches DRIVE BELT TENSION ADJUSTME...

Page 14: ...speed in Heating mode and while in second stage Cooling mode The start up procedure is the same as for Air Conditioning Start up Procedure with the understanding that in Step 6 the indoor blower will...

Page 15: ...ndenser fans and tighten set screws FILTERS CAUTION TO PREVENT PROPERTY DAMAGE DUE TO FIRE AND LOSS OF EQUIPMENT EFFICIENCY OR EQUIPMENT DAMAGE DUE TO DUST AND LINT BUILD UP ON INTERNAL PARTS NEVER OP...

Page 16: ...7 2 14 6257 1 80 5711 1 66 0 6 7477 2 97 6899 2 51 6323 2 10 5716 1 72 5103 1 39 0 8 7112 2 96 6467 2 46 5795 2 01 5101 1 61 1 0 5983 2 38 5190 1 89 1 2 4426 1 71 CFM BHP CFM BHP CFM BHP CFM BHP CFM B...

Page 17: ...ATIONS VOLTAGE NAMEPLATE MIN MAX Qty RLA LRA Qty HP RLA HP FLA HP FLA 208 230 60 3 187 253 2 33 3 239 0 3 1 3 2 40 BD STD STATIC 5 0 12 7 5 0 14 0 460 60 3 414 506 2 17 9 125 0 3 1 3 1 20 BD STD STATI...

Page 18: ...X C UNIT DIMENSIONS B C D A B C D A Model A B C D 15 Ton 20 Ton 133 1 2 88 7 32 50 9 32 5 5 32 VERTICAL DISCHARGE TOP VIEW 21 60 7 48 22 2013 5151 San Felipe St Suite 500 Houston TX 77056 www daikinco...

Page 19: ...o its standard terms and conditions of sale including Limited Product Warranty Consult your local Daikin Applied Representative for warranty details To find your local Daikin Applied Representative go...

Reviews: