![background image](http://html1.mh-extra.com/html/daikin/ctkm28pv2s/ctkm28pv2s_service-manual_3429920014.webp)
PCBs
Si041351ED
12
Removal Procedure
3. Remove the display PCB.
1
Unfasten the 4 hooks
and remove the display
PCB.
2
3
Release the harness
from the hook.
Disconnect the
connector [S49].
[S49]: to control PCB
4. Remove the control PCB.
1
Unfasten the 3 hooks
and remove the control
PCB.
2
Pull out the earth /
ground wire (yellow /
green) from the terminal
board.
When reassembling, make
sure to connect the
connectors as shown in the
illustrations below.
3
Pull out the 4 terminals
from the terminal board.
Step
Procedure
Points
(R19304)
Display PCB
Hook
Hook
(R9530)
Hook
[S49]
(R18739)
Hook
Hook
Control PCB
Earth / ground wire
(yellow / green)
(R22119)
Black
Red
Earth / ground (green)
Earth / ground
(yellow / green)
White
FRONT
Type 1
(R22120)
Red
Black
Earth / ground (green)
Earth / ground
(yellow / green)
White
FRONT
Type 2
(R22121)
(R9519)
Terminal