![background image](http://html1.mh-extra.com/html/daikin/ctkc15qvm4/ctkc15qvm4_removal-procedure_4699271010.webp)
PCBs
Si041551EB
8
Removal Procedure
5. PCBs
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1. Remove the control PCB.
[S26]: display/signal receiver
PCB
1
2
Remove the connector
[S26].
Release the harnesses
from the 3 hooks and
the slit.
3
Disconnect all the 5
terminals.
4
Release the earth/
ground wire (yellow/
green) from the slit and
the groove.
[S26]
Hook
Slit
Hook
(R22066)
White
Red
Black
Earth/ground (yellow/green)
Earth/ground
(green)
(R22067)
1
2
3
FRONT
Black
Red
Earth/ground (green)
Earth/ground
(yellow/green)
White
(R22265)
Slit
Earth/ground
wire
(yellow/green)
Groove
(R22069)