CAUTION

1) Use the flare nut fixed to the main unit. (To prevent cracking of the flare nut by aged deterioration.)
2) To prevent gas leakage, apply refrigeration oil only to the inner surface of the flare. (Use refrigeration oil for R410A.)
3) Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage.

Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand.  Then tighten them fully with the torque wrenches. 

2-1. Caution on piping handling. 

1) Protect the open end of the pipe against dust and moisture.
2) All pipe bends should be as gentle as possible. Use a pipe bender 

for bending. 
(Bending radius should be 30 to 40mm or larger.)

2-2. Selection of copper and heat insulation materials.

• When using commercial copper pipes and fittings, observe the following:
1) Insulation material:  Polyethylene foam

Heat transfer rate:  0.041 to 0.052W/mK (0.035 to 0.045kcal/(mh •°C))
Refrigerant gas pipe’s surface temperature reaches 110°C max.
Choose heat insulation materials that will withstand this temperature.

2) Be sure to insulate both the gas and liquid piping and to provide insulation dimen-

sions as below.

3) Use separate thermal insulation pipes for gas and liquid refrigerant pipes.

Gas side

Liquid side

Gas pipe thermal insulation

Liquid pipe 

thermal 

insulation

20/25/35 class

50 class

20/25/35 class

50 class

O.D. 9.5mm

O.D. 12.7mm

O.D. 6.4mm

I.D. 12-15mm

I.D. 14-16mm

I.D. 8-10mm

Thickness 0.8mm

Thickness 10mm Min.

Torque wrench

Piping union

Flare nut

Do not apply refrigeration 

oil to the outer surface.

Flare nut

Apply refrigeration oil to 

the inner surface of the 

flare.

Do not apply refrigeration 

oil to the flare nut avoid 

tightening with over torque.

Spanner

[Apply oil]

[Tighten]

Flare nut tightening torque

 Gas 

side

Liquid side

 

20/25/35 class

50 class

 

3/8 inch

1/2 inch

1/4 inch

 32.7-39.9N 

l

 m

49.5-60.3N 

l

 m 

14.2-17.2N 

l

 m

  (330-407kgf 

l

 cm) 

(505-615kgf 

l

 cm)

(144-175kgf 

l

 cm)

     

   

    

     

    

    

   

Gas pipe

Liquid pipe

Gas pipe

insulation

Liquid pipe

insulation

Finishing tape

Drain hose

Inter-unit wiring

01_EN_3P212421-1.fm  Page 11  Wednesday, September 26, 2007  5:57 PM

Summary of Contents for ATXS20E2V1B

Page 1: ...an ais Nederlands Espa ol Italiano Portugues Installation manual R410A Split series Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding R410A Split s...

Page 2: ...6 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Daikin TCF 015 74736 KRQ EMC97 4957 Dai...

Page 3: ...amping may cause terminal overheating or fire After connecting interconnecting and supply wiring be sure to shape the cables so that they do not put undue force on the electrical covers or panels Inst...

Page 4: ...m electronic ignition type fluorescent lamps inverter or rapid start type as they may shorten the remote control range 8 the unit is at least 1 metre away from any television or radio set unit may cau...

Page 5: ...ter 2 Remove the front grille 3 In front of the mark of the front grille there are 3 upper hooks Lightly pull the front grille toward you with one hand and push down on the hooks with the fingers of y...

Page 6: ...con trollers can be set for different addresses 1 In the same way as when connecting to an HA system remove the metal plate electrical wiring cover 2 Cut the address jumper JA on the printed circuit b...

Page 7: ...finishing tape from bottom to top Cut thermal insulation pipe to an appropriate length and wrap it with tape making sure that no gap is left in the insulation pipe s cut line Caulk pipe hole gap with...

Page 8: ...and Dimensions 80 100 400 135 450 283 47 5 141 5 50 5 46 5 44 5 131 5 87 44 5 110 60 130 220 50 60 110 800 65 65 Use tape measure as shown Position the end of a tape measure at Keep here the piece cu...

Page 9: ...e and refrigerant pipes through the wall hole then set the indoor unit on the mounting plate hooks by using the markings at the top of the indoor unit as a guide 4 Open the front panel then open the s...

Page 10: ...atch indoor unit press the bottom edge of indoor unit with both hands until it is firmly caught by the mounting plate hooks Secure indoor unit to the mounting plate with screws M4 12L 3 3 Wall embedde...

Page 11: ...rds or starburst connections as they may cause overheating electrical shock or fire 2 Do not use locally purchased electrical parts inside the product Do not branch the power for the drain pump etc fr...

Page 12: ...e pipe 5 Check that the flaring is properly made WARNING 1 Do not use mineral oil on flared part 2 Prevent mineral oil from getting into the system as this would reduce the lifetime of the units 3 Nev...

Page 13: ...efrigerant gas pipe s surface temperature reaches 110 C max Choose heat insulation materials that will withstand this temperature 2 Be sure to insulate both the gas and liquid piping and to provide in...

Page 14: ...turned off 1 3 Carry out the test operation in accordance with the Operation Manual to ensure that all functions and parts such as louver movement are working properly The air conditioner requires a...

Page 15: ...0710 HT 3P212421 1 M07B075 Two dimensional bar code is a code for manufacturing 00_CV_3P212421 1 fm Page 2 Friday July 20 2007 2 31 PM...

Reviews: