![background image](http://html.mh-extra.com/html/daikin/atxg25ev1b/atxg25ev1b_service-manual_501394016.webp)
Removal of Horizontal Blade
Si04-858
14
Removal Procedure
5. Removal of Horizontal Blade
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Remove the horizontal
blade.
The horizontal blade is
single.
Installation procedure
1. Since key pattern hook is
provided, rotate the blade
and fit it to the left pivot first.
2. Fit the blade to the right
pivot.
3. Fit the blade to the center
pivot.
1
Release the center
pivot.
2
Bend the horizontal
blade slightly and
remove it.
Swing motor (for horizontal blade)
Horizontal blade
(R3811)
(R5039)
(R3816)
(R3813)
(R3814)
(R3815)