
Si04-402A
Outdoor Unit
Removal Procedure
169
2.7
Removal of PCB
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Remove the PCB.
You can remove the PCB
when you disconnect the
read wires on the terminal
board without removing the
electrical box.
PbF (Pb free brazing) is
adopted.
1
Feature of the PCB
2
Loosen the screw on
the terminal board.
3
Release the earth
terminal.