Piping installation

5.1

Preparing refrigerant piping

5.1.1

Refrigerant piping requirements

NOTICE

The  piping  and  other  pressure-containing  parts  shall  be
suitable  for  refrigerant.  Use  phosphoric  acid  deoxidised
seamless copper for refrigerant piping.

Piping material:

 phosphoric acid deoxidised seamless copper

Flare connections:

 Only use annealed material.

Piping diameter:

Liquid piping

Gas piping

Ø6.4 mm (1/4")

Ø9.5 mm (3/8")

Piping temper grade and thickness:

Outer diameter

(Ø)

Temper grade

Thickness (t)

(a)

6.4 mm (1/4")

Annealed (O)

≥0.8 mm

t

Ø

9.5 mm (3/8")

Annealed (O)

(a)

Depending on the applicable legislation and the maximum
working pressure of the unit (see "PS High" on the unit name
plate), larger piping thickness might be required.

5.1.2

Refrigerant piping insulation

▪ Use polyethylene foam as insulation material:

▪ with a heat transfer rate between 0.041 and 0.052 W/mK (0.035

and 0.045 kcal/mh°C)

▪ with a heat resistance of at least 120°C

▪ Insulation thickness

Pipe outer diameter

p

)

Insulation inner

diameter (Ø

i

)

Insulation thickness

(t)

6.4 mm (1/4")

8~10 mm

≥10 mm

9.5 mm (3/8")

10~14 mm

≥13 mm

Ø

i

Ø

i

t

Ø

p

Ø

p

If  the  temperature  is  higher  than  30°C  and  the  humidity  is  higher
than RH 80%, the thickness of the insulation materials should be at
least  20  mm  to  prevent  condensation  on  the  surface  of  the
insulation.

5.1.3

Refrigerant piping length and height
difference

What?

Distance

Maximum allowable pipe length

20 m

Minimum allowable pipe length

1.5 m

Maximum allowable height difference

15 m

5.2

Connecting the refrigerant piping

DANGER: RISK OF BURNING/SCALDING

CAUTION

▪ No  brazing  or  welding  on  site  for  units  with  R32

refrigerant charge during shipment.

▪ During installation of the refrigeration system, joining of

parts with at least one part charged shall be performed
taking  into  account  the  following  requirements:  inside
occupied  spaces  non-permanent  joints  are  NOT
allowed  for  R32  refrigerant  except  for  site  made  joints
directly connecting the indoor unit to piping. Site made
joints directly connecting piping to indoor units shall be
of non-permanent type.

5.2.1

About connecting the refrigerant piping

Before connecting the refrigerant piping

Make sure the outdoor and indoor unit are mounted.

Typical workflow

Connecting the refrigerant piping involves:

▪ Connecting the refrigerant piping to the indoor unit

▪ Connecting the refrigerant piping to the outdoor unit

▪ Insulating the refrigerant piping

▪ Keeping in mind the guidelines for:

▪ Pipe bending

▪ Flaring pipe ends

▪ Using the stop valves

5.2.2

Precautions when connecting the
refrigerant piping

DANGER: RISK OF BURNING/SCALDING

NOTICE

▪ Use the flare nut fixed to the main unit.

▪ To  prevent  gas  leakage,  apply  refrigeration  oil  only  to

the  inside  of  the  flare.  Use  refrigeration  oil  for  R32
(

Example: 

 FW68DA).

▪ Do NOT reuse joints.

WARNING

Connect the refrigerant piping securely before running the
compressor. If the refrigerant piping is NOT connected and
the stop valve is open when the compressor is run, air will
be  sucked  in.  This  will  cause  abnormal  pressure  in  the
refrigeration cycle, which may result in equipment damage
and even injury.

5.2.3

To connect the refrigerant piping to the
outdoor unit

Piping length.

 Keep field piping as short as possible.

Piping  protection.

  Protect  the  field  piping  against  physical

damage.

WARNING

Connect the refrigerant piping securely before running the
compressor. If the refrigerant piping is NOT connected and
the stop valve is open when the compressor is run, air will
be  sucked  in.  This  will  cause  abnormal  pressure  in  the
refrigeration cycle, which may result in equipment damage
and even injury.

Summary of Contents for ARXD25A5V1B

Page 1: ...Installation manual R32 Split series English Installation manual R32 Split series ARXD25A5V1B ARXD35A5V1B...

Page 2: ...s instrukcij atbilst d m direkt v m vai regul m ja vien ie izstr d jumi tiek lietoti saska ar m su instrukcij m s v zhode s nasleduj cou imi smernicou ami alebo predpisom mi za predpokladu e sa v rob...

Page 3: ...N standby electricity saving function 12 10 Commissioning 13 10 1 Checklist before commissioning 13 10 2 Checklist during commissioning 13 10 3 To perform a test run 13 11 Troubleshooting 13 11 1 Faul...

Page 4: ...use refrigerant gas leakage DANGER RISK OF EXPLOSION Do NOT open the stop valves before the vacuum drying is finished Charging refrigerant see 6 Charging refrigerant 49 WARNING The refrigerant inside...

Page 5: ...efore you can touch electrical components For the location of the terminals see the wiring diagram Finishing indoor unit installation see 8 Finishing the outdoor unit installation 412 DANGER RISK OF E...

Page 6: ...tlet b Air inlet NOTICE The height of the wall on the outlet side of the outdoor unit MUST be 1200 mm It is recommended to install a baffle plate when the air outlet is exposed to wind It is recommend...

Page 7: ...shers field supply 20 mm 311 5 7 4 2 1 1 mm 2 1 1 a a 100 mm above expected level of snow 4 2 2 To install the outdoor unit 4 M8 M10 4 2 3 To provide drainage NOTICE If the unit is installed in a cold...

Page 8: ...ing installation of the refrigeration system joining of parts with at least one part charged shall be performed taking into account the following requirements inside occupied spaces non permanent join...

Page 9: ...ssure Then Does not change There is no moisture in the system This procedure is finished Increases There is moisture in the system Go to the next step 3 Vacuum the system for at least 2 hours to a man...

Page 10: ...tal length m of liquid piping 10 m 0 020 R Additional charge kg rounded in units of 0 01 kg INFORMATION Piping length is the one way length of liquid piping 6 4 To determine the complete recharge amou...

Page 11: ...measure the voltage at the terminals of main circuit capacitors or electrical components before servicing The voltage MUST be less than 50 V DC before you can touch electrical components For the loca...

Page 12: ...ume when the temperature rises again To cut jumper J6 1 Remove the top plate of the outdoor unit 2 Remove the front plate 3 Remove the drip proof cover 4 Cut jumper J6 on the outdoor unit PCB J6 J4 J9...

Page 13: ...consequence Condensate water might drip The indoor unit receives the signals of the user interface The specified wires are used for the interconnection cable The fuses circuit breakers or locally inst...

Page 14: ...n the unit Part numbering is by Arabic numbers in ascending order for each part and is represented in the overview below by in the part code Symbol Meaning Symbol Meaning Circuit breaker Protective ea...

Page 15: ...erminal strip block Y E Electronic expansion valve coil Y R Y S Reversing solenoid valve coil Z C Ferrite core ZF Z F Noise filter 14 Piping diagram 14 1 Piping diagram Outdoor unit M 7 0 CuT 7 0 CuT...

Page 16: ...ANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P650253 15Q 2022 12 Copyright 2...

Reviews: