background image

Table of contents

Installation manual

3

35A5V1B
R32 Split series
3P650253-15Q – 2022.12

Table of contents

1 About the documentation

3

1.1

About this document..................................................................

3

2 Specific installer safety instructions

3

3 About the box

5

3.1

Outdoor unit...............................................................................

5

3.1.1

To unpack the outdoor unit .........................................

5

3.1.2

To remove the accessories from the outdoor unit.......

5

4 Unit installation

6

4.1

Preparing the installation site ....................................................

6

4.1.1

Installation site requirements of the outdoor unit ........

6

4.1.2

Additional installation site requirements of the
outdoor unit in cold climates .......................................

6

4.2

Mounting the outdoor unit..........................................................

7

4.2.1

To provide the installation structure ............................

7

4.2.2

To install the outdoor unit............................................

7

4.2.3

To provide drainage ....................................................

7

4.2.4

To prevent the outdoor unit from falling over ..............

7

5 Piping installation

8

5.1

Preparing refrigerant piping .......................................................

8

5.1.1

Refrigerant piping requirements..................................

8

5.1.2

Refrigerant piping insulation .......................................

8

5.1.3

Refrigerant piping length and height difference ..........

8

5.2

Connecting the refrigerant piping ..............................................

8

5.2.1

About connecting the refrigerant piping ......................

8

5.2.2

Precautions when connecting the refrigerant piping ...

8

5.2.3

To connect the refrigerant piping to the outdoor unit ..

8

5.3

Checking the refrigerant piping .................................................

9

5.3.1

To check for leaks.......................................................

9

5.3.2

To perform vacuum drying ..........................................

9

6 Charging refrigerant

9

6.1

About charging refrigerant.........................................................

9

6.2

About the refrigerant..................................................................

10

6.3

To determine the additional refrigerant amount ........................

10

6.4

To determine the complete recharge amount ...........................

10

6.5

To charge additional refrigerant ................................................

10

6.6

To fix the fluorinated greenhouse gases label...........................

10

7 Electrical installation

10

7.1

Specifications of standard wiring components ..........................

11

7.2

To connect the electrical wiring to the outdoor unit ...................

11

8 Finishing the outdoor unit installation

12

8.1

To finish the outdoor unit installation.........................................

12

8.2

To close the outdoor unit...........................................................

12

9 Configuration

12

9.1

Facility setting............................................................................

12

9.1.1

To set the facility mode ............................................... 12

9.2

Standby electricity saving function ............................................

12

9.2.1

About the standby electricity saving function .............. 12

9.2.2

To turn ON standby electricity saving function............ 12

10 Commissioning

13

10.1

Checklist before commissioning ................................................

13

10.2

Checklist during commissioning ................................................

13

10.3

To perform a test run .................................................................

13

11 Troubleshooting

13

11.1

Fault diagnosis using LED on outdoor unit PCB .......................

13

12 Disposal

14

13 Technical data

14

13.1

Wiring diagram ..........................................................................

14

13.1.1

Unified wiring diagram legend...................................... 14

14 Piping diagram

15

14.1

Piping diagram: Outdoor unit...................................................... 15

1

About the documentation

1.1

About this document

WARNING

Make  sure  installation,  servicing,  maintenance,  repair  and
applied  materials  follow  the  instructions  from  Daikin
(including  all  documents  listed  in  “Documentation  set”)
and, in addition, comply with applicable legislation and are
performed  by  qualified  persons  only.  In  Europe  and  areas
where  IEC  standards  apply,  EN/IEC  60335-2-40  is  the
applicable standard.

Target audience

Authorised installers

INFORMATION

This  document  only  describes  installation  instructions
specific  to  the  outdoor  unit.  For  installation  of  the  indoor
unit  (mounting  the  indoor  unit,  connecting  the  refrigerant
piping to the indoor unit, connecting the electrical wiring to
the indoor unit …), see the installation manual of the indoor
unit.

Documentation set

This  document  is  part  of  a  documentation  set.  The  complete  set
consists of:

General safety precautions:

▪ Safety instructions that you MUST read before installing

▪ Format: Paper (in the box of the outdoor unit)

Outdoor unit installation manual:

▪ Installation instructions

▪ Format: Paper (in the box of the outdoor unit)

Installer reference guide:

▪ Preparation of the installation, reference data, …

▪ Format:  Digital  files  on 

https://www.daikin.eu

.  Use  the  search

function   to find your model.

Latest revisions of the supplied documentation may be available on
the regional Daikin website or via your dealer.

The original documentation is written in English. All other languages
are translations.

Technical engineering data

▪ A 

subset

  of  the  latest  technical  data  is  available  on  the  regional

Daikin website (publicly accessible).

▪ The 

full  set

  of  latest  technical  data  is  available  on  the  Daikin

Business Portal (authentication required).

2

Specific installer safety
instructions

Always observe the following safety instructions and regulations.

Summary of Contents for ARXD25A5V1B

Page 1: ...Installation manual R32 Split series English Installation manual R32 Split series ARXD25A5V1B ARXD35A5V1B...

Page 2: ...s instrukcij atbilst d m direkt v m vai regul m ja vien ie izstr d jumi tiek lietoti saska ar m su instrukcij m s v zhode s nasleduj cou imi smernicou ami alebo predpisom mi za predpokladu e sa v rob...

Page 3: ...N standby electricity saving function 12 10 Commissioning 13 10 1 Checklist before commissioning 13 10 2 Checklist during commissioning 13 10 3 To perform a test run 13 11 Troubleshooting 13 11 1 Faul...

Page 4: ...use refrigerant gas leakage DANGER RISK OF EXPLOSION Do NOT open the stop valves before the vacuum drying is finished Charging refrigerant see 6 Charging refrigerant 49 WARNING The refrigerant inside...

Page 5: ...efore you can touch electrical components For the location of the terminals see the wiring diagram Finishing indoor unit installation see 8 Finishing the outdoor unit installation 412 DANGER RISK OF E...

Page 6: ...tlet b Air inlet NOTICE The height of the wall on the outlet side of the outdoor unit MUST be 1200 mm It is recommended to install a baffle plate when the air outlet is exposed to wind It is recommend...

Page 7: ...shers field supply 20 mm 311 5 7 4 2 1 1 mm 2 1 1 a a 100 mm above expected level of snow 4 2 2 To install the outdoor unit 4 M8 M10 4 2 3 To provide drainage NOTICE If the unit is installed in a cold...

Page 8: ...ing installation of the refrigeration system joining of parts with at least one part charged shall be performed taking into account the following requirements inside occupied spaces non permanent join...

Page 9: ...ssure Then Does not change There is no moisture in the system This procedure is finished Increases There is moisture in the system Go to the next step 3 Vacuum the system for at least 2 hours to a man...

Page 10: ...tal length m of liquid piping 10 m 0 020 R Additional charge kg rounded in units of 0 01 kg INFORMATION Piping length is the one way length of liquid piping 6 4 To determine the complete recharge amou...

Page 11: ...measure the voltage at the terminals of main circuit capacitors or electrical components before servicing The voltage MUST be less than 50 V DC before you can touch electrical components For the loca...

Page 12: ...ume when the temperature rises again To cut jumper J6 1 Remove the top plate of the outdoor unit 2 Remove the front plate 3 Remove the drip proof cover 4 Cut jumper J6 on the outdoor unit PCB J6 J4 J9...

Page 13: ...consequence Condensate water might drip The indoor unit receives the signals of the user interface The specified wires are used for the interconnection cable The fuses circuit breakers or locally inst...

Page 14: ...n the unit Part numbering is by Arabic numbers in ascending order for each part and is represented in the overview below by in the part code Symbol Meaning Symbol Meaning Circuit breaker Protective ea...

Page 15: ...erminal strip block Y E Electronic expansion valve coil Y R Y S Reversing solenoid valve coil Z C Ferrite core ZF Z F Noise filter 14 Piping diagram 14 1 Piping diagram Outdoor unit M 7 0 CuT 7 0 CuT...

Page 16: ...ANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P650253 15Q 2022 12 Copyright 2...

Reviews: