SiBE04-401
Indoor Unit
Removal Procedure
149
4
Disengage the hooks of
the pipe retainer on the
back.
5
Pull auxiliary pipe
forward to an angle of
10 to 20 degrees.
Be careful to prevent pipe
deformation.
6
Disengage hooks
located right and left
side, and pull heat
exchanger forward.
The hooks are
symmetrically placed in
the right and the left.
Lifting the heat-exchanger
slightly upward to the right,
the left hook comes to be
disengaged easily.
Step
Procedure
Points
Summary of Contents for ARKH20CVMB9
Page 67: ...Control Specification SiBE04 401 58 Function and Control ...
Page 97: ...Instruction SiBE04 401 88 System Configuration ...
Page 141: ...Check SiBE04 401 132 Service Diagnosis ...
Page 211: ...Outdoor Unit RK X H C ARK X H C R Y N C SiBE04 401 202 Removal Procedure ...
Page 215: ...Others SiBE04 401 206 Others ...