3 About the box
Installer reference guide
7
ERHQ+ERLQ011~016 + EHBH/X11+16CB
Daikin Altherma – Low temperature split
4P384974-1 – 2015.01
Chapter
Description
Disposal
How to dispose of the system
Technical data
Specifications of the system
Glossary
Definition of terms
Field settings table
Table to be filled in by the installer, and
kept for future reference
Note:
There is also an installer settings
table in the user reference guide. This
table has to be filled in by the installer
and handed over to the user.
3
About the box
3.1
Overview: About the box
This chapter describes what you have to do after the boxes with the
outdoor and indoor unit are delivered on-site.
It contains information about:
▪ Unpacking and handling the units
▪ Removing the accessories from the units
Keep the following in mind:
▪ At delivery, the unit must be checked for damage. Any damage
must be reported immediately to the carrier's claims agent.
▪ Bring the packed unit as close as possible to its final installation
position to prevent damage during transport.
3.2
Outdoor unit
3.2.1
To unpack the outdoor unit
2
1
3.2.2
To handle the outdoor unit
Carry the unit slowly as shown:
102~114 kg
CAUTION
To avoid injury, do NOT touch the air inlet or aluminum fins
of the unit.
3.2.3
To remove the accessories from the
outdoor unit
1×
2
1
a
1×
c
1×
b
2×
d
1×
e
1×
f
1×
g
1×
a
Outdoor unit installation manual
b
Cable tie
c
Fluorinated greenhouse gases label
d
Multilingual fluorinated greenhouse gases label
e
Screw (only for ERLQ)
f
Thermistor fixing plate (spare) (only for ERLQ)
g
Thermistor fixture (only for ERLQ)
3.3
Indoor unit
3.3.1
To unpack the indoor unit