4
x
Set-up and installation
Installation and maintenance instructions
16
Daikin Altherma M ECH
2
O
Solar storage tank with heating controller
008.1446799_00 – 07/2019 – EN
●
Remove packing and dispose of it in an environment-friendly
manner.
●
Pull off the cover screens (fig.
B) from the storage
tank and unscrew the threaded fittings (fig.
F) from
the openings at which the handles are to be fitted (fig.
3-2, item
24).
●
A) into the now uncovered
threaded holes.
A
Handle
B
Cover screen
F
Threaded piece
Fig.
4-4
Installing the handles
●
Install the Daikin Altherma M ECH
2
O at the installation site.
– Recommended clearances (fig.
From the wall: (s1)
≥
100
mm, (s2)
≥
500
mm.
From the ceiling (X):
≥
1200
mm, at least 480
mm.
– Transport the Daikin Altherma M ECH
2
O using the han-
dles.
– When setting up the unit in a cabinet, behind panels or in
other restricted conditions, sufficient ventilation (e.g.,
using ventilation gratings) must be ensured.
●
If required, install the optional backup heater (EKBUxx) in the
Daikin Altherma M ECH
2
Observe the installation and operating instructions enclosed
with the accessories (
tightening torque, see chap.
10.4).
1200 mm
ኢ
X
2.
3.
4.
5.
s2
s1
>80°C
<1000 mm
max. 10 Nm
≥ 2050
X
1.
Fig.
4-5
Installation (shown on EKHWMX(B)500C with installation of
the optional backup heater)