19
©
2014
Daikin
North
America,
LLC
Suspension,
Leveling,
Filters,
Return
Options
Condensate
Drain
Trap,
Drain
Pan,
and
Lines
Horizontal
Right
Side
Down
Horizontal
Left
Side
Down
Venting
Gas
Valve
and
Connections
Electrical
Connections
24
Volt
Thermostat
Wiring
ComfortNet
Furnace
Start
Up
Temperature
Rise
and
Blower
Speed
Adjust
Duct
Static
Agenda
©
2014
Daikin
North
America,
LLC
All
furnaces
are
dual
certified,
and
built
with
a
2”
vent/
intake
pipe
and
connectors
.
Transitioning
from
2”
to
3”
PVC
pipe
should
be
done
as
close
to
the
furnace
as
possible
.
Do
not
connect
to
Type
B,
BW,
or
L
vent
or
any
vent
connector.
(metal)
Must
not
be
vented
to
any
portion
of
a
factory
built,
or
masonry
chimney
except
when
used
as
a
pathway
for
PVC
to
pass
through.
Direct
or
Non
‐
Direct
Venting