![background image](http://html1.mh-extra.com/html/daikin/4mxs-r-series/4mxs-r-series_service-manual_4193026233.webp)
SiUS121736EA
Trial Operation and Field Settings
220
Part 7
Trial Operation and
Field Settings
1. Pump Down Operation ............................................................................221
2. Forced Cooling Operation .......................................................................222
3. Wiring Error Check Function ...................................................................223
4. Trial Operation ........................................................................................ 225
6. Silicone Grease on Power Transistor/Diode Bridge ................................ 249