Pump Down Operation

In order to protect the environment, be sure to pump down when relocating or disposing of the unit.

1) Remove the valve caps on the liquid and the gas stop valves at the pipes for rooms A 

and B. 

2) Run the unit on forced cooling. (Refer to the instructions below.)
3) After 5 to 10 minutes, close the liquid stop valves at the pipes for rooms A and B 

using a hex wrench.

4) After 2 to 3 minutes, stop the forced cooling operation as quickly as possible after the 

gas stop valves at the pipes for rooms A and B have been shut off.

5) Turn the power breaker off. 

 CAUTION

Run the air conditioner to cool both rooms A and B when performing a pump down.

1.

Forced cooling operation

1-1. Using the indoor unit start/stop button.

1) Press the start/stop button on the indoor unit in either room A or B for 5 seconds continuously.

The units in both rooms will start.

2) Forced cooling operation will end after around 15 minutes and the unit will stop automatically. Press the start/stop 

button on the indoor unit to force the operation to stop.

3) Use this method to force cooling operation when the outside temperature is 10°C or lower.

1-2. Using the wireless remote controller.

1) Select cooling operation and press the start/stop button. (The unit will start.)
2) Press the temperature 

 button, 

 button, and the “mode” button at the same time.

3) Press the “mode” button twice.

(  will be displayed and the unit will go into test-run mode.)

4) Test-run mode will end after around 30 minutes and the unit will stop automatically. Press the start/stop button to 

force the test-run to stop.

 CAUTION

If the outside temperature is 10°C or lower, the safety device might start, preventing operation. In this situation, warm the outside 
temperature thermistor on the outdoor unit to 10°C or warmer. Operation will start.

Gas 
stop valve

Valve cap

Hexagonal 
wrench

Close

Liquid 
stop valve

Summary of Contents for 2MXS40H3V1B2

Page 1: ...English T rk e Installation manual R410A Split series Montaj k lavuzlar R410A Split serisi Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding R410A...

Page 2: ...Certificado C 06 Nota delineato nel A e giudicato positivamente da B secondo il Certificato C 07 A B C 08 Nota tal como estabelecido em A e com o parecer positivo de B de acordo com o Certificado C 0...

Page 3: ......

Page 4: ...f the control box lid may result in electric shocks fire or over heating terminals If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refriger...

Page 5: ...f sulfate gas corrosion may shorten the life of the air condi tioner 9 Since drain flows out of the outdoor unit do not place under the unit anything which must be kept away from moisture NOTE Cannot...

Page 6: ...ng base optional parts Clamping material Insulation tube Service lid Tape Also insulate the connection on the outdoor unit Use tape or insulating material on all connections to prevent air from gettin...

Page 7: ...ation bolts Prepare 4 sets of M8 or M10 foundation bolts nuts and washers each which are available on the market It is best to screw in the foundation bolts until their ends are 20mm from the foundati...

Page 8: ...formance Connect so that the piping is as short as possible Shortest allow able length per room is 3m Piping to each indoor unit 20m max Total length of piping between all units 30m max If the outdoor...

Page 9: ...e of the flare Use refrigeration oil for R410A Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the f...

Page 10: ...pressure valves on the gauge manifold and stop the vacuum pump Leave as is for 4 5 minutes and make sure the coupling meter needle does not go back If it does go back this may indicate the presence of...

Page 11: ...refrigerant may slowly leak out do not leave the flare nut removed for a long period of time Do not overfill with refrigerant This will break the compressor Filling a cylinder with an attached siphon...

Page 12: ...on flared part Prevent mineral oil from getting into the system as this would reduce the lifetime of the units Never use piping which has been used for previous installations Only use parts which are...

Page 13: ...inuously The units in both rooms will start 2 Forced cooling operation will end after around 15 minutes and the unit will stop automatically Press the start stop button on the indoor unit to force the...

Page 14: ...e sure to use the round crimp style terminal for connection to the power supply terminal block Place the round crimp style terminals on the wires up to the covered part and secure in place 3 Pull the...

Page 15: ...bend the electric box hook 4 Remove the lower electric box cover 5 Cut the jumper J3 of the PCB inside 6 Go back through step 4 3 2 1 Make sure all components are well secured when doing this CAUTION...

Page 16: ...t the manual included with the indoor unit Instruct the customer how to operate the unit correctly particularly cleaning of the air filters operation procedures and temperature adjustment Even when th...

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ...3P401524 1 2015 02 Copyright 2015 Daikin...

Reviews: