background image

11 Maintenance and service

Installation manual

16

50A

R32 Split series

3P600450-5L – 2021.12

The 

fuses, circuit breakers,

 or locally installed protection

devices  are  installed  according  to  this  document,  and
have NOT been bypassed.

Check  if  marks  (room  A  and  B)  on  the  wiring  and  piping
match for each indoor unit.

Check  if  the  priority  room  setting  is  set  for  2  or  more
rooms. Keep in mind that the DHW generator for Multi or
the  Hybrid  for  Multi  shall  not  be  selected  as  the  priority
room.

10.2

Checklist during commissioning

To perform a 

wiring

 check.

To perform an 

air purge

.

To perform a 

test run

.

10.3

Trial operation and testing

Before  starting  the  test  run,  measure  the  voltage  at  the
primary side of the 

safety breaker

.

The 

piping and wiring work

 match.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

Initialization of the Multi system can take several minutes depending
on the number of indoor units and options used.

10.3.1

To perform a test run

INFORMATION

If the unit runs into an error during commissioning, see the
service manual for the detailed troubleshooting guidelines.

Prerequisite: 

Power supply MUST be in the specified range.

Prerequisite: 

Test run operation may be done in cooling or heating

mode.

Prerequisite: 

Test  run  should  be  done  in  accordance  with  the

operation  manual  of  the  indoor  unit  to  make  sure  that  all  functions
and parts are working properly.

1

In  cooling  mode,  select  the  lowest  programmable  temperature.
In heating mode, select the highest programmable temperature.

2

Measure the temperature at the indoor unit inlet and outlet after
running the unit for about 20 minutes. The difference should be
more than 8°C (cooling) or 15°C (heating).

3

First  check  operation  of  each  unit  individually,  then  check
simultaneous  operation  of  all  indoor  units.  Check  both  heating
and cooling operation.

4

When test run is finished, set the temperature to a normal level.
In cooling mode: 26~28°C, in heating mode: 20~24°C.

INFORMATION

▪ Test run can be disabled if necessary.

▪ After the unit is turned OFF, it cannot be started again

for 3 minutes.

▪ During  cooling  operation,  frost  may  form  on  the  gas

stop valve or other parts. This is normal.

INFORMATION

▪ Even if the unit is turned OFF, it consumes electricity.

▪ When the power turns back on after a power break, the

previously selected mode will be resumed.

11

Maintenance and service

NOTICE

General  maintenance/inspection  checklist.

  Next  to  the

maintenance  instructions  in  this  chapter,  a  general
maintenance/inspection  checklist  is  also  available  on  the
Daikin Business Portal (authentication required).

The 

general 

maintenance/inspection 

checklist 

is

complementary  to  the  instructions  in  this  chapter  and  can
be  used  as  a  guideline  and  reporting  template  during
maintenance.

NOTICE

Maintenance  MUST  be  done  by  an  authorised  installer  or
service agent.

We  recommend  performing  maintenance  at  least  once  a
year. However, applicable legislation might require shorter
maintenance intervals.

NOTICE

Applicable  legislation  on 

fluorinated  greenhouse  gases

requires  that  the  refrigerant  charge  of  the  unit  is  indicated
both in weight and CO

2

 equivalent.

Formula  to  calculate  the  quantity  in  CO

2

  equivalent

tonnes:

  GWP  value  of  the  refrigerant  ×  total  refrigerant

charge [in kg] / 1000

12

Disposal

NOTICE

Do  NOT  try  to  dismantle  the  system  yourself:  dismantling
of  the  system,  treatment  of  the  refrigerant,  oil  and  other
parts  MUST  comply  with  applicable  legislation.  Units
MUST  be  treated  at  a  specialised  treatment  facility  for
reuse, recycling and recovery.

INFORMATION

To  protect  the  environment,  make  sure  to  perform  an
automatic  pump  down  operation  when  relocating  or
dismantling  the  unit.  For  the  pump  down  procedure,  refer
to the service manual or the installer reference guide.

13

Technical data

▪ A 

subset

  of  the  latest  technical  data  is  available  on  the  regional

Daikin website (publicly accessible).

▪ The 

full  set

  of  latest  technical  data  is  available  on  the  Daikin

Business Portal (authentication required).

13.1

Wiring diagram

The wiring diagram is delivered with the unit, located inside of
the outdoor unit (bottom side of the top plate).

13.1.1

Unified wiring diagram legend

For applied parts and numbering, refer to the wiring diagram on the
unit.  Part  numbering  is  by  Arabic  numbers  in  ascending  order  for
each part and is represented in the overview below by "*" in the part
code.

Summary of Contents for 2MXM40A2V1B

Page 1: ...Installation manual R32 Split series English Installation manual R32 Split series 2MXM40A2V1B 2MXM50A2V1B ...

Page 2: ...uina v platném znění Smjernice kako je izmijenjeno irányelv ek és módosításaik rendelkezéseit z późniejszymi poprawkami 18 19 20 21 22 23 24 25 Directivelor cu amendamentele respective Direktive z vsemi spremembami Direktiivid koos muudatustega Директиви с техните изменения Direktyvose su papildymais Direktīvās un to papildinājumos Smernice v platnom znení Değiştirilmiş halleriyle Yönetmelikler 01...

Page 3: ...n sallittu lämpötila TS TSmin Alhaisin matalapainepuolen lämpötila L C TSmax Suurinta sallittua painetta PS vastaava kyllästyslämpötila M C Kylmäaine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maximální přípustný tlak PS K bar Minimální maximální přípustná teplota TS TSmin Minimální teplota na nízkotlaké straně L C TSmax Saturovaná teplota odpovída...

Page 4: ...iunile noastre skladni z naslednjimi standardi in drugimi normativi pod pogojem da se uporabljajo v skladu z našimi navodili on vastavuses järgmis t e standardi te ga või teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele съответстват на следните стандарти или други нормативни документи при условие че се използват съгласно нашите инструкции atitinka žemiau nurodytus...

Page 5: ...commissioning 15 10 2 Checklist during commissioning 16 10 3 Trial operation and testing 16 10 3 1 To perform a test run 16 11 Maintenance and service 16 12 Disposal 16 13 Technical data 16 13 1 Wiring diagram 16 13 1 1 Unified wiring diagram legend 16 13 2 Piping diagram Outdoor unit 17 1 About the documentation 1 1 About this document INFORMATION Make sure that the user has the printed documenta...

Page 6: ...un air will be sucked in This will cause abnormal pressure in the refrigeration cycle which may result in equipment damage and even injury CAUTION Do NOT open the valves before flaring is complete This would cause refrigerant gas leakage DANGER RISK OF EXPLOSION Do NOT start the unit if it is vacuumed Charging refrigerant see 6 Charging refrigerant 411 WARNING The refrigerant inside the unit is mi...

Page 7: ...tes after the power supply is turned off because of high voltage risk Please note that some sections of the electric component box are hot Make sure you do NOT touch a conductive section Do NOT rinse the unit This may cause electric shocks or fire DANGER RISK OF ELECTROCUTION Use this compressor on a grounded system only Turn the power off before servicing the compressor Reattach the switch box co...

Page 8: ...nal installation site requirements of the outdoor unit in cold climates Protect the outdoor unit against direct snowfall and take care that the outdoor unit is NEVER snowed up a b c c d a Snow cover or shed b Pedestal c Prevailing wind direction d Air outlet It is recommended to provide at least 150 mm of free space below the unit 300 mm for heavy snowfall areas Additionally make sure the unit is ...

Page 9: ...ble for refrigerant Use phosphoric acid deoxidised seamless copper for refrigerant Foreign materials inside pipes including oils for fabrication must be 30 mg 10 m Refrigerant piping diameter Class 40 Liquid piping 2 Ø6 4 mm 1 4 Gas piping 2 Ø9 5 mm 3 8 Class 50 Liquid piping 2 Ø6 4 mm 1 4 Gas piping 1 Ø9 5 mm 3 8 1 Ø12 7 mm 1 2 INFORMATION Usage of reducers might be required based on the indoor u...

Page 10: ...side occupied spaces non permanent joints are NOT allowed for R32 refrigerant except for site made joints directly connecting the indoor unit to piping Site made joints directly connecting piping to indoor units shall be of non permanent type CAUTION Do NOT connect the embedded branch piping and the outdoor unit when only carrying out piping work without connecting the indoor unit in order to add ...

Page 11: ...gas 5 3 2 To perform vacuum drying DANGER RISK OF EXPLOSION Do NOT start the unit if it is vacuumed NOTICE Connect the vacuum pump to both the service ports of the gas stop valves 1 Vacuum the system until the pressure on the manifold indicates 0 1 MPa 1 bar 2 Leave as is for 4 5 minutes and check the pressure If the pressure Then Does not change There is no moisture in the system This procedure i...

Page 12: ...refrigerant piping is connected and checked leak test and vacuum drying 1 Connect the refrigerant cylinder to the service port 2 Charge the additional refrigerant amount 3 Open the gas stop valve 6 5 To fix the fluorinated greenhouse gases label 1 Fill in the label as follows b Contains fluorinated greenhouse gases 2 1 1 1 2 2 kg tCO2 eq GWP kg 1000 kg kg GWP XXX RXXX a f c d e a If a multilingual...

Page 13: ...or lead wire k S92 white gas thermistor lead wire l Multimeter DC voltage range 7 1 Specifications of standard wiring components Component Power supply cable Voltage 220 240 V Phase 1 Frequency 50 Hz Wire type 3 core cable 2 5 mm2 H05RN F 60245 IEC 57 H07RN F 60245 IEC 66 3 core cable 4 0 mm2 H07RN F 60245 IEC 66 Interconnection cable indoor outdoor 4 core cable 1 5 mm2 or 2 5 mm2 and applicable f...

Page 14: ...setting Prerequisite The main power supply MUST be turned off 1 Remove the top plate of the outdoor unit 2 screws on sides 2 Remove the electric box cover by sliding it Be careful not to bend the electric box hook 3 Cut the jumper J23 J26 J24 J23 J6 J22 J8 a b e c d a Top plate b Electric box cover c PCB jumpers d PCB e Electric box 4 Reinstall the electric box cover and the top plate in reverse o...

Page 15: ...klist Next to the commissioning instructions in this chapter a general commissioning checklist is also available on the Daikin Business Portal authentication required The general commissioning checklist is complementary to the instructions in this chapter and can be used as a guideline and reporting template during the commissioning and hand over to the user NOTICE ALWAYS operate the unit with the...

Page 16: ...nutes During cooling operation frost may form on the gas stop valve or other parts This is normal INFORMATION Even if the unit is turned OFF it consumes electricity When the power turns back on after a power break the previously selected mode will be resumed 11 Maintenance and service NOTICE General maintenance inspection checklist Next to the maintenance instructions in this chapter a general mai...

Page 17: ...tor M C Compressor motor M F Fan motor M P Drain pump motor Symbol Meaning M S Swing motor MR MRCW MRM MRN Magnetic relay N Neutral n N Number of passes through ferrite core PAM Pulse amplitude modulation PCB Printed circuit board PM Power module PS Switching power supply PTC PTC thermistor Q Insulated gate bipolar transistor IGBT Q C Circuit breaker Q DI KLM Earth leak circuit breaker Q L Overloa...

Page 18: ... j A B A B k l l m n o o p q r s t n m i h g c c 2MXM50 A Room A k Field piping liquid B Room B l Liquid stop valve a 4 way valve ON heating m Thermistor liquid b High pressure switch with automatic reset n Filter c Muffler o Motor operated valve d Discharge pipe thermistor p Muffler e Compressor q Outdoor air temperature thermistor f Accumulator r Heat exchanger g Branch pipe M Fan motor h Thermi...

Page 19: ......

Page 20: ...3P600450 5L 2021 12 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...

Reviews: