![background image](http://html1.mh-extra.com/html/daikin/2mkc30qvm4/2mkc30qvm4_service-manual_3289060007.webp)
Si121656E
Electrical Box / PCB
Removal Procedure
5
3. Electrical Box / PCB
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1. Remove the shield plate.
When reassembling, make
sure that the 5 hooks are
securely fastened.
1
2
Remove the screw of
the stop valve cover.
Slide the stop valve
cover downward and
remove it.
3
Remove the screw of
the shield plate.
4
Lift up the shield plate
and unfasten the 2
hooks to remove it.
When reassembling, make
sure that the 2 hooks are
securely fastened.
(R23608)
Stop valve cover
Hook
Hook
(R23609)
(R23610)
Shield plate
Hook
(R23611)