![background image](http://html1.mh-extra.com/html/daikin/2mkc30qvm4/2mkc30qvm4_service-manual_3289060021.webp)
Si121656E
Compressor
Removal Procedure
19
2
3
Remove the protection
bushing.
Disconnect the
compressor lead wires
and the overload
protector.
4
5
6
7
8
Remove the putty.
Heat up the brazed part
of the discharge side
pipe and disconnect it.
Heat up the brazed part
of the suction side pipe
and disconnect it.
Remove the 3 nuts.
Lift up the compressor
and remove it.
Step
Procedure
Points
V (yellow)
U (red)
Protection bushing
Overload protector
W (blue)
(R23650)
Brazed part of the
discharge side pipe
Compressor
Nut
Putty
Brazed part of the
suction side pipe
(R23651)