27
MEASUREMENT AND TEST
3. COMPONENT TEST PROCEDURE
High voltage is present at the high voltage terminal of the high voltage transformer during any cooking cycle.
It is neither necessary nor advisable to attempt measurement of the high voltage.
Before touching any oven components or wiring, always unplug the oven from its power source and discharge the capacitor.
1. High voltage transformer
1) Remove connections from the transformer terminals and check continuity.
2) Normal readings should be as follows :
Secondary winding ... Approx. 110
§
Ù
±10%
Filament winding ... Approx. 0
§
Ù
Primary winding ... Approx. 1
§
Ù
2. High voltage capacitor
1) Check continuity of capacitor with meter on the highest OHM scale.
2) A normal capacitor will show continuity for a short time, and then indicate 10M
§
Ù
once the capacitor charged.
3) A shorted capacitor will show continuous continuity.
4) An open capacitor will show constant 10M
§
Ù
.
5) Resistance between each terminal and chassis should be infinite.
3. High voltage diode
1) Isolate the diode from the circuit by disconnecting the leads.
2) With the ohmmeter set on the highest resistance scale measure the resistance across the diode terminals. Reverse
the meter leads and again observe the resistance reading. Meter with 6V, 9V or higher voltage batteries should be
used to check the front-back resistance of the diode, otherwise an infinite resistance may be read in both directions. A
normal diode's resistance will be infinite in one direction and several hundred k
§
Ù
in the other direction.
4. Magnetron
For complete magnetron diagnosis, refer to “Measurement of the Microwave Power Output. " Continuity checks can only
indicate and open filament or a shorted magnetron. To diagnose for an open filament or a shorted magnetron,
1) Isolate magnetron from the circuit by disconnecting the leads.
2) A continuity check across magnetron filament terminals should indicate 0.1
§
Ù
or less.
3) A continuity check between each filament terminal and magnetron case should read open.
5. Fuse
If the fuse in the primary and monitor switch circuit is blown when the door is opened, check the primary and monitor
switch before replacing the blown fuse. In case the fuse is blown by an improper switch operation, replace the defective
switch and fuse at the same time. Replace just the fuse if the switches operate normally.
Summary of Contents for KOR-131G0A
Page 5: ...4 EXTERNAL VIEW 1 OUTER DIMENSION ...
Page 29: ...28 WIRING DIAGRAM ...
Page 31: ...30 MP1 MP2 PRINTED CIRCUIT BOARD Measure Point ...
Page 33: ...32 PRINTED CIRCUIT BOARD 2 P C B CIRCUIT DIAGRAM ...
Page 37: ...36 PRINTED CIRCUIT BOARD PRINTED CIRCUIT BOARD MP1 MP2 MP3 Measure Point ...
Page 40: ...39 PRINTED CIRCUIT BOARD 2 PCB CIRCUIT DIAGRAM ...
Page 46: ...45 EXPLODED VIEW AND PARTS LIST 2 KOR 131H4 and KOR 131G4 ...