User Guide
STAR N04
3
INSTALLATION GUIDE
Drawn by Brad Han
Date : 2009. 1. 1.
Rev. 0
Tel : +82 32 858 0491
www.daehantrans.com
Fax : +82 32 832 8421
MATERIAL ESTIMATE
Attention to : John Doe
Page 1 of 1
NUMBER OF SET
Information
Model
Power Supply
Quantity
Color
Quantity
STAR C04
WHITE
143EA
DC12V 120W
2
S-LED ESTIM
A
TE /SE
T
SUMM
AR
Y
POWER ESTIM
A
T
E /SE
T
MODULE PITCH
1
QUANTITY PER SET
143EA
TOTAL CLUSTERS
143EA
WATTAGE PER SET
187W
TOTAL WATTAGE
187W
120mm
*This is for estimating purposes only. Material Estimates for S-LED system are based upon given font, letter height, depth, face material, and any special instructions.
*Missing information will affect the final results
*Power consumption is calculated with extra 15% for extended life of power supplies
*All signs should be tested for acceptable color, illumination and operation. Use appropriate power supply for testing
*For detailed information, please refer to the applicable S-LED product found under http://www.daehantrans.com/download/products2007.pdf
34
STAR C04 WHITE x 143
6
22
34
41
1000 mm
1. DETERMINE LAYOUT
Refer to ‘LAYOUT DENSITY GUIDELINES’ on page 2 to
determine spacing and amount of LEDs required.
SUPPORTS FOR OUR SIGNMATES
Ask us to obtain accurate layout
Stroke Width
Channel Depth
2. PEEL AND STICK
Using predetermined layout and LED placement
from step 1, remove 3M tape on the back of modules
and stick them into place. Ensure modules are firmly
attached on the surface.
CAUTION
When handling the module, avoid pressing
down directly on top of LED lamp
The strand of modules should not be looped to
create a closed circuit.
3. CAP ALL UNUSED WIRES
Using predetermined layout and LED placement
from step 1, divide channels into sections and
distribute each section to corresponding power
supplies.
CAUTION
Before connect with power supplies, check
polarity on every connections
4. CONNECT WITH POWER SUPPLY
12
0
AC Input
DC Output
12
0
AC Input
DC Output
FASTENERS :
If desired, modules can be secured
with M2.5*15 metal screws.
SILICON :
If desired, modules can be secured with
silicon. Do not to put silicon on the top of the LED
lamps.
5. FIX MODULES PERMANENTLY
Wire Nut
DAEHANTRANS CO.,LTD
#7-11 Songdo-Dong, Yeonsu-Gu, Incheon, Korea
Tel. +82 32 858 0491 Fax. +82 32 832 8421 [email protected] / www.daehantrans.com