7
i
nsTallaTion
i
nsTRuCTions
Accessory Doors
Accessory Doors Specifications
IMPORTANT:
1. Excessive weight warning - Both the cart and
the grill are extremely heavy and this installation
assembly process should be accomplished by a
minimum of two people.
2. Sheet metal edges can be dangerous in heavy
lifting situations, please wear gloves during
assembly.
3. To lighten the grill before assembly, remove
individual components box packed inside the grill.
4. Remove the cart from the shipping pallet before
installation assembly.
NOTES:
1. The Dacor cart ships assembled ready for the
EOG Outdoor Grill installation assembly.
2. All gas and electrical connections should be made
after the grill is installed and bolted to the cart.
Specifications
Measurements
Overall Width
AGAD20 - 19 1/2” (495mm)
AGAD36 - 35 7/8” (911mm)
Overall Height
21” (533mm)
Overall Depth
1/4” (6mm) deep return on frame edge
Cutout Width
AGAD20 - 16 3/4” (425mm)
AGAD39 - 33 1/8” (841mm)
Cutout Height
18 3/4” (476mm)
Cutout Depth
3” (76mm) Minimum
3. Your cart is prepared for either natural gas or
liquid propane gas connections. However, it is
important to verify that your EOG was ordered
correctly. If you will be utilizing LP gas, your
EOG grill must indicate LP in the serial tag
identification. Do not proceed with assembly if the
EOG model is not correct. Field conversion from
one gas type to another is not recommended by
Dacor.
1. Remove the cart from the shipping carton and pallet.
2. Set the cart in an open location and lock the wheel on the
cart to minimize potential movement. Remove the right side
roll out tank drawer.
3. Loosen the two fasteners, located in the front right corner
behind the horizontal support, temporarily creating a 1/2” gap
between the support rail and right side panel.
4. Remove the EOG from its shipping carton and pallet.
Remember to remove the individual components box to
lighten the appliance.
5. Slide the EOG into the cart making sure that it is all the
way back in the opening as far as possible. At this point the
mounting holes under the bottom of the EOG should align
with the holes in the cart supports.
6. Tighten the two fasteners that were loosened in step 3 before
securing the EOG to the cart.
7. Prepare to secure the EOG to the cart by removing the left
drawer. Once this is out of your way locate the two assembly
bolts which are inside the EOG parts package.
8. Install the bolts, then return the left side drawer to its location.
9. Before installing the right side roll out tank drawer, Install
the regulator and hose on the grill drawer for final gas
connection.
10. Proceed to steps 4 and 5 in the EOG installation instructions
for the appropriate gas and electrical connections and step 6
to verify proper operation.
11. Install the right side slide out tank shelf.
12.
Five gallon LP tanks are the largest
recommended tank for installation in the
rollout tank drawer.
NOTE:
Dacor offers a protective grill or grill/
cart cover. For more information
concerning these covers contact
your Dacor appliance dealer.
Planning Installation Cart
Lift up work
Surface
Fixed
wheels
Loosen
Fasteners
1/2" Gap before install
Roll out storage
Drawers (2)
Roll out
LP tank
drawer
Gas and
Electrical
Locking
wheel
Lift up work
Surface
Assembly
Shown: OGC36 and EOG36
Length: 41 3/8” (1051mm), Height: 36” (914mm), Width: 26 1/4” (667mm)
Not Shown: OGC52 and EOG52
Length: 57” (1448mm), Height: 36” (914mm), Width: 26 1/4” (667mm)