English
30
Operations
Operations
Provision for Open Access to the Connected Product Requirements
1.
SGIP Open Standards (Smart Energy Profile 2.0 - http://www.csep.org/)
- Energy Consumption Reporting
- Demand Response
2.
OPEN API
- Operational Status, User Settings & Messages
- ICE Maker Status: GET /devices/0/Fridge/iceMaker
- Door Open Alarm: GET /devices/0/Door/<<id>>/openState
- DR Status: GET /devices/0/drlc
- Delay Defrost Capability
- Set Schedule of the Defrost Delay: PUT /devices/0/fridge/<<id>>/DefrostReservation
- Get Schedule of the Defrost Delay: GET /devices/0/fridge/<<id>>/DefrostReservation
- Delete Schedule of the Defrost Delay: DELETE /devices/0/fridge/<<id>>/
DefrostReservation
- Defrost Delay On/OFF: PUT /devices/0/Fridge/delayDefrost
Dacor_BRR9000M_REF_DA68-03607B-02_EN.indd 30
2017-03-20 5:36:18