15
Installation Instructions
IMPORTANT
:
Install the custom handles prior to installing the panels on the
refrigerator.
Create custom door overlay panels according to the
specifications in the
Custom Panels and Handles
section.
Dacor is not responsible for customer installed molding or
decorative panels that need to be removed or replaced to
service the refrigerator.
Handle Installation
Before installing a custom panel assembly, install the custom
handle hardware.
Counter-sink the screw head into the back of the panel to allow
the panel to slide into place smoothly and for proper fit.
Top Grille Panel Installation
1. Grasp both ends of the top grille. Push straight up, then pull
straight out. Place the top grille panel-side down on a soft
working surface.
2. Remove one end cap by loosening the nuts and sliding off the
end cap.
Custom Panel and Handle Installation
3. Slide the panel into the top grille
channel and reattach the end
cap.
4. Replace the top grille in the
cabinet side trims and pull the
panel down slightly to lock it into
place.
Door Panel Installation
1. Remove all tape and door bracing from the refrigerator and
freezer doors.
2. Open the refrigerator and freezer compartment doors.
3. Remove the handle side and top trims.
4. Slide the custom panels into the bottom and hinge side trims
on the refrigerator compartment and freezer compartment
doors, making sure that the backer panel fits into the hinge
side trims.
5. Reinstall the handle-side and
top trims.
6. Remove the film from the screw
covers
C
. Slide or snap the
screw covers into the handle
trim section.
7. Check refrigerator level and
alignment. Adjust if needed.
Front View
Front View
A. Countersunk screw
B. Handle
C. Door panel assembly
Side View
A
B
C
A. Top grille
B. Cabinet side trim
A
B
B
C. Bottom rail
D. Nuts
E. End cap
F. Top rail
C
D
E
F
A. Trims
A
A
B. Panels
B
B
G. Panel
G
C
Summary of Contents for DISCOVERY DYF42BNDI
Page 21: ......