B
S3x
x-
-engl
--220199
Operating manual for welding unit
Type: BS304 / BS306 / BS308 / BS310
BSS
BS3xx
Page 15
22.01.99
Installation
This chapter describes how to set up the welding equipment.
Hinweis:
The equipment may only be installed and connected by personnel familiar with those tasks
and made aware of the hazards involved.
Setting up the stud welding equipment
Unpacking
S
First remove the accompanying materials and accessories from the package. Keep the transport
package in a safe place.
S
Always use this original package for transporting or shipping the equipment.
S
If you do not want to keep the packaging materials make sure they are disposed of in a non--polluting
manner.
Setting up
Choose a suitable location. Such location should meet the following requirements:
S
sufficient distance from refrigerating sets and heat sources,
S
no extreme temperature variations,
S
no direct solar radiations,
S
no excessive accmulation of dust, aggressive chemicals or vapours,
S
ambient temperature between 10
°
and 40
°
C,
S
relative humidity between 20% and 80%.
Connection
Connecting the power cable to the welding equipment
Remark:
Make sure the equipment is turned off.
S
At the back panel of the equipment, insert the cold
equipment plug into the cold equipment socket.
Make sure the mains voltage is correct: 110V--240V.
S
Use the retaining clip to secure the cold equipment plug.
Power off
Cold equipment plug
Retaining clip
Summary of Contents for BS310
Page 28: ...0 220199 Einzelteile HP TSK310...
Page 31: ...g 220199 Parts of HP TSG 310...