ENGLISH
38
1. WARNINGS
1.1
Before installation, carefully read this documentation and that supplied with the pump
manual and the control panel.
It is indispensable to have the electric and hydraulic connections made by skilled personnel, in
possession of the technical qualifications indicated by the safety standards concerning the
design, installation and maintenance of technical plants, in force in the country where the
product is to be installed.
Failure to comply with the safety regulations not only causes risk to personal safety and
damage to the equipment, but invalidates every right to assistance under guarantee.
1.2
The term
skilled personnel
means persons whose training, experience and instruction, as
well as their knowledge of the respective standards and requirements for accident prevention
and working conditions, have been approved by the person in charge of plant safety,
authorizing them to perform all the necessary activities, during which they are able to
recognize and avoid all dangers. (Definition for technical personnel IEC 364).
The appliance is not intendend for use by persons (including children) with reduced physical,
sensory or mental capabilities, or lack of experience and knowledge, unless they have been
given supervision or instruction concerning use of the appliance by a person responsable for
their safety. Children should be supervised to ensure that they do not play with the appliance
1.3
Check that the system has suffered no damage during transport or storage. In particular,
ensure that the external casing is perfectly entire and in excellent condition; check the
efficiency of all the tank components; replace any parts that are not perfectly efficient.
1.4
Do not use inflammable or highly corrosive liquids or anything other than indicated by standard
En 12050-1
1.5
If the installation is indoors, adequate drainage must be ensured in the event of leakage from
the tank
1.6
For correct installation, follow the instructions in chapters 3-4-5 below. If you want to install the
Fekabox – Fekafos lifting tanks outside the home,
attention must be paid because the
maximum admissible load on the cover is 100 kg (see also the symbols on the cover).
2. RESPONSIBILITY
The Manufacturer does not vouch for correct operation of the machine or answer for any damage that it may
cause if it has been tampered with, modified and/or run outside the recommended work range or in contrast
with other indications given in this manual.
3. MANAGEMENT
3.1 Storage
All the products must be stored indoors, in a dry, vibration-free and dust-free environment, possibly with
constant air humidity.
3.2 Transport
Avoid subjecting the products to needless jolts or collisions.
To lift and transport the tank, use lifting equipment and the pallet supplied standard (if applicable).
Summary of Contents for FEKAFOS 280
Page 112: ...110 1 1 1 1 2 IEC 364 1 3 1 4 En 12050 1 1 5 1 6 3 4 5 Fekabox Fekafos 100 2 3 3 1 3 2...
Page 114: ...112 4 1 Fekabox 200 Fekafos 280 280 Double Fekafos 550 Double...
Page 117: ...115 5 5 Fekabox 200 Fekafos 280 Fekafos 550 2 GAS PP 5 6 5 3 5 7 6B 6A 6A 6B...
Page 118: ...116 5 8 5 9 1 5 10 4...
Page 127: ...125 9 5 7 9 1 0 7 2 3 9 2 10...
Page 128: ...126 11 1 A B C D E F G A B 280 C D F G 2 A A 12 e 1 2 Dab Pumps...
Page 166: ...164 1 1 1 1 2 IEC 364 1 3 1 4 En 12050 1 1 5 1 6 3 4 5 Fekabox Fekafos 100 Kg 2 3 3 1 3 2...
Page 167: ...165 4 FEKABOX FEKAFOS FEKABOX FEKAFOS 1 5 2 6 3 7 4 8 e box fekafos 4 2 1 8 5 7 3 6 1 2 3...
Page 168: ...166 4 1 Fekabox 200 Fekafos 280 280 Double Fekafos 550 Double...
Page 171: ...169 5 5 Fekabox 200 Fekafos 280 Fekafos 550 2 GAS PP PVC 5 6 5 3 5 7 O ring 6B 6A 6B 6A...
Page 172: ...170 5 8 5 9 5 10 4...
Page 181: ...179 9 5 7 9 1 0 7 m s 2 3 m s 9 2 10...
Page 182: ...180 11 1 280 2 A A 12 1 2 Dab Pumps...
Page 202: ...200 1 1 1 1 2 IEC 364 1 3 1 4 EN 12050 1 1 5 1 6 3 4 5 Fekabox Fekafos 100 2 3 3 1...
Page 203: ...201 3 2 4 FEKABOX FEKAFOS FEKABOX FEKAFOS 1 5 2 6 3 7 4 8 Fekafos 4 2 1 8 5 7 3 6 1 2 3...
Page 204: ...202 4 1 Fekabox 200 Fekafos 280 280 Double Fekafos 550 Double...
Page 207: ...205 5 5 Fekabox 200 Fekafos 280 2 5 6 5 3 5 7 6B 6A 6A 6B...
Page 208: ...206 5 8 5 9 1 5 10 4...
Page 217: ...215 9 5 7 9 1 0 7 2 3 9 2 10...
Page 218: ...216 11 1 A B C D E F G A B 280 C D F G 2 A A 12 1 2 Dab Pumps...
Page 256: ...254 1 1 1 1 2 IEC 364 1 3 1 4 En 12050 1 1 5 1 6 3 4 5 Fekabox Fekafos 100 2 3 3 1 3 2...
Page 257: ...255 4 FEKABOX FEKAFOS FEKABOX FEKAFOS 1 5 2 6 3 7 4 8 fekafos 4 2 1 8 5 7 3 6 1 2 3...
Page 258: ...256 4 1 Fekabox 200 Fekafos 280 280 Double Fekafos 550 Double...
Page 261: ...259 5 6 5 3 5 7 O B A 6A 6B...
Page 262: ...260 5 8 5 9 1 5 10 4...
Page 270: ...268 2 Fekabox 200 510 mm Fekafos 280 280D 680mm ED E2D AS1 9 5 7 9 1 0 7 2 3 Fig 12...
Page 271: ...269 9 2 10 11 1 A B C D E F G A B 280 550 C D F G 2 A A 12 1 2 Dab Pumps...