ENGLISH
GB
41
RESPONSIBILITY
The Manufacturer does not vouch for correct operation of
the electropumps or answer for any damage that they may
cause if they have been tampered with, modified and/or run
outside the recommended work range or in contrast with
other indications given in this manual.
The Manufacturer declines all responsibility for possible er
-
rors in this instructions manual, if due to misprints or errors
in copying. The Manufacturer reserves the right to make any
modifications to products that it may consider necessary
or useful, without affecting their essential characteristics
.
1- GENERAL
The product is an integrated system composed mainly of a self-priming
multi-stage centrifugal electropump, an electronic circuit that controls it
and an expansion vessel.
Applications
Water systems supply and pressure boosting domestic use or industrial
use.
On the outside the product appears as a parallelepiped that presents 6
faces as shown in Fig.1.
Figure 1
Face A:
a door allows access to the Technical Compartment.
Inside the technical compartment you can access (see Fig.3):
1. Rapid Guide;
2. Technical data plate;
3. Filling cap (only for vertical
configuration);
4. Accessory tool;
5. Motor shaft;
6. QR-code
Face B:
A rubber cable gland allows the exit of the power cable to be con
-
nected to the power mains.
Face C:
the 4 brass threads form the seat for the 4 support feet in the case
of vertical installation. The two 1” screw caps can be removed to make the
connections towards the system, depending on the installation configura
-
tion you want to adopt. If applicable, connect to the connection marked
“IN” the system from which you want to draw water (well, cistern,…) and
connect the delivery system to the connection marked “OUT”. There is also
a ventilation grid. The 3/8” cap allows drainage of the system in the case of
horizontal installation. There is also a ventilation grid.
Face E:
the 4 brass threads form the seat for the 4 support feet in the case
of horizontal installation. The main function of the 1” cap is drainage of the
system in the case of vertical installation. There are also 2 ventilation grids.
Figure 2
Figure 3
1
2
3
4
5
6
B
C
E
F
A