background image

Printed in U.S.A.

93489  Rev. 11/04

3

RS-232 Communications

The command protocols are as follows.

Screen 1 up:

@1U

Screen 1 stop: @1S

Screen 1 down: @1D

Screen 2 up:

@2U

Screen 2 stop: @2S

Screen 2 down: @2D

Poll:

@P

Response to a poll is @1x2x where x is U for up, S for stop, D for down.

Communications is 9600 baud, 8 data bits, No parity, 1 stop bit.

No “Return” or “Enter” is required at end of string. The command will be executed as soon as the U, D, or S is received.

There is a 50ms time out if a valid character is received but the string is not finished. All command characters must be
sent in one packet.

Built-In SCB-100 Control

Locate the 11-pin connector in the junction box of the screen. Refer to diagram 4 for wire connections.

RS-232 Ports

The SCB-100 has two RS-232 ports. Both ports have three wire connections.
RX-Data being received into the SCB-100.
TX-Data going out of the SCB-100.
G-Ground.

Wall Switch

The wall switch terminal is a dry contact closure. Do not apply voltage to this terminal or the control will be damaged.

1. Install the wall switch where desired.

2. Use 3-conductor 20-24 gauge wire to extend the switch wire to the required length.

12VDC Out

The SCB-100 supplies power to the optional NET-100 network adaptor. If you are using the NET-100 adaptor, connect the
power wire from the NET-100 to the 12VDC output terminal.

INSTALLATION

1

2

3

4

5

6

7

8

9 10 11

1

2

3

4

5

6

7

8

9 10 11

RX-DATA IN
G-GROUND
TX-DATA OUT

RX-DATA IN
G-GROUND
TX-DATA OUT

WHITE-COMMON
BLACK-DOWN
RED-UP

-

12VDC OUT

TERMINALS 1-3 = RS232 PORT 2
TERMINALS 4-6 = RS232 PORT 1
TERMINALS 7-9 = WALL SWITCH
TERMINALS 10-11 = NET-100 CONTROLLER

Summary of Contents for SCB-100

Page 1: ...treet Post Office Box 137 Warsaw Indiana 46581 0137 Phone 574 267 8101 800 622 3737 Fax 574 267 7804 www da lite com e mail info da lite com POWER PRESENTATION PRODUCTS The In Installation and Operating Instructions For SERIAL CONTROL BOARD SCB 100 ...

Page 2: ...e ports are for dry contact closure only Port 1 controls motor 1 Port 2 controls motor 2 1 Install wall switch where desired 2 Use 3 conductor 20 24 gauge wire to extend the switch wire to the required length 3 Connect the wall switch to the SCB 100 as shown in diagram 1 CAUTION Never apply voltage to the wall switch terminal or the unit will be damaged RS 232 The SCB 100 has two RS 232 ports Port...

Page 3: ...th Power Source 1 Connect power wires to the SCB 100 as shown in diagram 3 2 Connect the building ground wire to the ground lug on the metal housing Diagram 2 SCREEN 2 OR PROJECTOR LIFT SCREEN 1 WHITE COMMON BLACK DOWN RED UP WHITE COMMON BLACK DOWN RED UP Diagram 3 SOURCE INPUT 100 240 VAC GREEN GROUND BLACK HOT WHITE COMMON 2 INSTALLATION SOURCE INPUT 100 120 VAC SCREEN 2 OR PROJECTOR LIFT SCREE...

Page 4: ...connections RS 232 Ports The SCB 100 has two RS 232 ports Both ports have three wire connections RX Data being received into the SCB 100 TX Data going out of the SCB 100 G Ground Wall Switch The wall switch terminal is a dry contact closure Do not apply voltage to this terminal or the control will be damaged 1 Install the wall switch where desired 2 Use 3 conductor 20 24 gauge wire to extend the s...

Reviews: