background image

QUICK INSTALLATION GUIDE  |  DIS-F100G SERIES

3

Mounting the Switch on a DIN Rail

Before beginning either mounting or removing the DIS-F100G from a DIN rail, please  
ensure that the DIN rail is level and that the DIN rail mounting kit is installed correctly on 
the DIS-F100G. Use the following instructions to install the DIS-F100G on a DIN rail:
1.  With the back of the DIS-F100G facing the DIN rail, lower the top part of the rail 

mounting kit onto the DIN rail.

2.  Push the DIS-F100G vertically down and rotate the bottom of the DIS-F100G towards 

the DIN rail, to attach the Switch to the DIN rail. 

Use the following instructions to remove the DIS-F100G from a DIN rail:
1.  Push the DIS-F100G vertically down to create enough space at the bottom of the rail 

mounting kit to remove the DIS-F100G from the DIN rail.

2.  Rotate the DIS-F100G upwards to remove the bottom of the rail mounting kit from the 

rail, and lift the DIS-F100G upwards to remove the whole of the Switch from the DIN rail.

Grounding the Switch

To use the DIS-F100G safely, it needs to be grounded. Connect a grounding wire to the 
grounding connector on the Switch and use a Phillips head screwdriver to secure the wire.
Attach the other end of the grounding cable to an appropriate grounding source.

Grounding Wire

Before You Begin

Observe the following precautions to help prevent shutdowns, equipment failures, and 
personal injury:
• 

Install the DIS-F100G in a cool and dry place. Refer to the technical specifications in the 
user manual for the acceptable operating temperature and humidity ranges.

• 

Leave at least 10 cm of space at the top, rear and bottom of the Switch for ventilation.

• 

Visually inspect the power connector and make sure that it is fully secured to the 
power cord.

• 

Do not stack any devices on top of the Switch.

It is also recommended that power and grounding requirements are investigated before 
mounting the Switch.

HARDWARE INSTALLATION

Summary of Contents for DIS-F100G Series

Page 1: ... Ports Getting Started Guide for Industrial Ethernet Switch This document will guide you through the basic installation process for your new D Link Industrial Ethernet Switch QUICK INSTALLATION GUIDE Documentation is also available on the D Link website see dlink com au ...

Page 2: ...Switch please refer to the user manual Package Contents This package should include the following items DIS F100G Series Switch Terminal block DIN rail mounts installed Quick Installation Guide If any of the above items are damaged or missing please contact your local D Link Reseller LED Indicators HARDWARE OVERVIEW LED Status Description P1 P2 On The corresponding power source is connected Off Th...

Page 3: ...ttom of the rail mounting kit from the rail and lift the DIS F100G upwards to remove the whole of the Switch from the DIN rail Grounding the Switch To use the DIS F100G safely it needs to be grounded Connect a grounding wire to the grounding connector on the Switch and use a Phillips head screwdriver to secure the wire Attach the other end of the grounding cable to an appropriate grounding source ...

Page 4: ...er inserted into P2 P2 If you only wish to use one power source insert the wires into P1 P1 2 Using a flat head screwdriver loosen the connections in the terminal block by un screwing the terminal connections that you wish to use 3 Insert the wires into the terminal connections and use the screwdriver to tighten the screws to secure the wires 4 Re insert the terminal block into the terminal block ...

Page 5: ...the user manual Do not spill food or liquid on your product and never push any objects into the openings of your product Do not use this product near water areas with high humidity or condensation unless the product is specifically rated for outdoor application Keep the product away from radiators and other heat sources Always unplug the product from mains power before cleaning and use a dry lint ...

Reviews: