DGS-3710 Series Layer 2 Managed Gigabit Switch Hardware Installation Guide
14
Chapter 2 Installation
Package Contents
Installation Guidelines
Power On
Alarm Connector (RJ45)
Installing SFP Ports
Connect to DC Power Plug
Package Contents
Open the shipping carton of the Switch and carefully unpack its contents. The carton should contain the following
items:
•
One DGS-3710 Series Switch
•
One AC power cord
•
One DCE RS-232 DB-9 console cable
•
One mounting kit (two brackets and screws)
•
Four rubber feet with adhesive backing
•
One DC male connector, used for connecting to the DC female power input, which is located on the front
panel.
•
One Alarm port cable.
If any item is missing or damaged, please contact your local D-Link Reseller for replacement.
Installation Guidelines
Please follow these guidelines for setting up the Switch:
•
Install the Switch on a sturdy, level surface that can support at least 8.8 lb. (4 kg) of weight. Do not place heavy
objects on the Switch.
•
The power outlet should be within 1.82 meters (6 feet) of the Switch.
•
Visually inspect the power cord and see that it is fully secured to the AC power port.
•
Make sure that there is proper heat dissipation from and adequate ventilation around the Switch. Leave at least
10 cm (4 inches) of space at the front and rear of the Switch for ventilation.
•
Install the Switch in a fairly cool and dry place for the acceptable temperature and humidity operating ranges.
•
Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust,
and direct exposure to sunlight.
•
When installing the Switch on a level surface, attach the rubber feet to the bottom of the device. The rubber
feet cushion the Switch, protect the casing from scratches and prevent it from scratching other surfaces.