Important Regulations

Observe regulations for danger warning systems VDE 0833, guidelines for electrical systems
VdS 2221, VDE 0100, DIN 18232 for smoke and heat vent systems, regulations of  the local
fire-brigade and of EVU for connection to mains supply.

Introduction

Smoke and heat vent systems (RWA´s) are very important

elements of structural preventive fire protection.

Smoke and heat vent systems are appliances of preventive fire protection. They fulfil important
functions in case of fire: protection of human life by providing a smokeless layer, by which
rescue routes are kept free for the fire-brigade. Consequential damages by conflagration
gases are reduced, and therefore, considerable material assets are often protected  from
destruction. Precondition for this is, that the systems will function absolutely reliable in a
case of fire. Only electrical specialist companies are authorized to install these systems,
who have electrical specialist staff with relevant experiences in installing danger alarm
systems or smoke and heat vent systems. Only these ones can take on responsibility for
functioning, and can ensure product liability for the whole system (see product liability law
BGBL.I S.2198 and BGB (bodily injury, compensation for damage)).
Therefore, regular maintenance and checking of functional readiness is imperative and has
to be ensured. These standard requirements are demanded according to regulations of the
DIN, of the Association of German Insurer against damage of property (VdS) and the
respective local authorities. Recommended is, that maintenance work should be carried
out by authorized specialist companies, only.

Only regular and professional maintenance warrants

the necessary and permanent functional safety.

Only authorized specialist companies are allowed to install and maintain smoke and heat
vent systems and system components, constructed and distributed by 

D+H Mechatronic

AG

. All 

D+H Mechatronic AG

 partners belong to these authorized specialist companies,

who regularly undergo an in-house training to ensure their qualification and experience.

Smoke and heat vent systems must be maintained at annual intervals by authorized special-
ist companies according to DIN 18232 section 2 paragraph 10.2, and VDE 0833 section 1
paragraph 5.3.4 for alarm systems and manufacturer guidelines.
According to DIN VDE 0108 section 1 paragraph 9.1.1 accumulators for emergency supply
(lead accumulators) must be checked every six months by a person, who has been introduced
to this task, and once a year, maintenance must be carried out by specialist companies.
Accumulator types, which are used for 

D+H Mechatronic AG

 smoke and heat vent systems

must be VdS approved, and must be released by 

D+H Mechatronic AG

 to use in smoke and

heat vent systems. According to DIN 18232 section 2 paragraph 10.2 the tests must be put
down in an operational book, which the operator/ building owner must present to the building
supervision authority on request. This operational book is available at D+H (Ord.-No.:
68.700.15)

Executed maintenance must be proved by a 

D+H Mechatronic AG

 maintenance/ and testing

confirmation.

Summary of Contents for RZN 4402-K

Page 1: ...by the manufacturer Green control diodes in the buttons must constantly lighten otherwise see Informations for Starting Repair power failure at once Emergency power supply for 72 hours Approval Numbe...

Page 2: ...y the latest maintenance instructions Following tests must be carried out in the course of maintenance Outside examination inspection of system components Measuring of insulation resistances Checking...

Page 3: ...ation of German Insurer against damage of property VdS and the respective local authorities Recommended is that maintenance work should be carried out by authorized specialist companies only Only regu...

Page 4: ...nts Retrofitable System Overview Drive group signal indicating board acoustical optical alarm devices signal contact 230V 50Hz Mains supply wind rain transmitter smoke vent button min 2 piece ventilat...

Page 5: ...x 262 x 81mm Mounting of housing 1 joint rod door plaster cross for flush mounting cable cover cable bushing only surface mounting housing flush mounted wall hook optional flush mounted set UPS 44 K n...

Page 6: ...of fire walls must not be inadmissibly influenced Sound insulation is impaired by flush mounting Final mounting 3 Mount and connect central pcb 4 Screw down cable cover 5 Unhinge door of the door fra...

Page 7: ...n cover plate in control panel View motherboard RZN 4402 04 K fire recognition element thermo maximum signal fuse drive fuse external detector Dip switch mains conne ction LED failure group LED contro...

Page 8: ...in the ceiling Size kind and arrangement of the opening is of decisive significance for an optimal effect of the smoke and heat vent system The important thing here is that an escape must not be hind...

Page 9: ...H N surface 24 VDC circa 1 5m above upper edge firm flooring by customer 55mm flush socket Vent button 24 VDC e g LT 43 circa 1 2 above upper edge firm flooring at flush type by others 55mm flush sock...

Page 10: ...e by thermal ascending force and by automatic fire recognition devices thermal detector smoke detector and they release either self acting or manual by smoke detectors at an early stage of a fire and...

Page 11: ...pinched in control panel for transport Take it off there and connect according to plan Terminal resistors must remain at binder RM 1 2 when no fire detector or external control exists Fire detectors...

Page 12: ...12 20 RZN 4402 04 K Rev 3 8 Parallel Connection of Smoke Vent Buttons RT 42...

Page 13: ...re pinched in control panel for transport Take it off there and connect according to plan Terminal resistors must remain at binder RM 1 2 when no fire detector or external control exists Fire detector...

Page 14: ...02 04 K line line control alarm close RM RT smoke vent button RT 43 H smoke vent button RT 43 N 10kW 10kW alarm alarm control control line line line line malfunction close close 2 2 7 8 7 3 3 1 1 6 6...

Page 15: ...15 20 RZN 4402 04 K Rev 3 8 Parallel Connection of 2 x 2 Smoke Vent Buttons RT43 H N...

Page 16: ...Magnetic clamp The resistor must not be used when line connections with 2 detector dependency are employed Connection of several fire detectors Connection of one fire detector terminal resistor line 1...

Page 17: ...wires Mot a Mot b derive off in par allel monitoring will be looped through all cables up to group end Example 1 1 line Simple installation but unfavourable for voltage drop All drives on one line Exa...

Page 18: ...be reset under special conditions only Performance check alarm reset and ventilation 10k resistance in smoke vent button 10k resistance in fire detector Stop module 2x47k in conduit box Connect mains...

Page 19: ...ossible then If Dip switch 5 is on OFF the function power failure CLOSED will be ineffective see Dip switch 4 Dip switch 6 on ON Ventilation flap opens up to final position by single pressing on vent...

Page 20: ...red display diode extinguishes in button and control panel Smoke vent must close Automatic fire detectors Release smoke detector individual by D H smoke detector tester as an alternative by cigarette...