14
ANCHORING THE OPERATOR
It is very important that the operator is mounted on a firm foundation that can not move or become
loose over time. The foundation should be constructed from concrete. The size of the plinth should be
about 300 by 300 mm square and about 200mm deep. The foundation plate supplied with the operator
must be securely mounted to the concrete using coach screws and plugs. The foundation plate can
also be welded to the gate rail if need be. The concrete should be allowed sufficient time to set before
the operator is mounted onto the plate.
Allow concrete to set and then place the
foundation plate onto the concrete plinth
3
Foundation plate
Place concrete plinth here
GATE CLOSING TO THE LEFT
Place concrete plinth here
GATE CLOSING TO THE RIGHT
2
Place the conduit in the correct position before filling the
hole with concrete. Flexible conduit may also be used.
4
Trim the conduit and the cable to the correct length
before placing the operator onto the foundation
plate.
Use 8mm coach screws to
mount the foundation plate
to the concrete
Dig a hole about 300mm
1
Top view
Gate
25mm
SOLO/
SPRINT
Foundation Plate
NOTE:
measurement is
dependant on the type of
rack used.
Always pre-measure the rack
before fixing the foundation
plate.