It is very  im portant that the m otor is m ounted on a firm  foundation that can not m ove or become loose over tim e. The 
foundation should be constructed from  concrete. The size of the plinth should be about 300 x 300 mm  square and about 
200mm  deep. The foundation plate supplied with the m otor m ust be securely  m ounted to the concrete using coach 
screws and plugs. The foundation plate can also be welded to the gate rail if need be. The concrete should be allowed 
sufficient time to set before the m otor is m ounted onto the plate. 

Allow concrete to set and then place the 
foundation plate onto the concrete plinth 

Foundation plate 

Place concrete plinth here 

Place concrete plinth here 

For a gate closing to the right 

For a gate closing to the left 

Place the conduit in the correct position before filling the 
hole with concrete. Flexible conduit may  also be used. 

Trim  the conduit and the cable to the correct length 
before placing the m otor onto the foundation plate. 

Use 8 mm  coach screws to 
m ount the foundation plate to 
the concrete 

Dig a hole about 300m m  square 

      Top view 
Foundation plate 

Gate 

Side view 
Foundation plate 

35mm 

ANCHORING  THE MOTOR 

15  

 

W

hen anchoring the m otor it is im portant to ensure that the following points are checked. 

1. 

The electrical cable is in place. 

2. 

The concrete is fully  set. 

3. 

The m otor foundation m ountings are secure and can not m ove or become loose. 

4. 

The m otor should be set level and parallel to the gate. 

5. 

The m otor m ust be set above the flood level or if this is not possible, a flood proof wall should be constructed 
around the m otor. 

After placing the m otor onto the three jack-up 
bolts, place the three clam ping nuts  and washers 
over the bolts to clam p the m otor in place. Use the 
Nut Applicator  as shown below. 

Top view 

Anti-lift device and 

Rollers  

P.C.B. 

Conduit  

Jack-up nuts 
for adj usting the 
m otor height. 

Concrete plinth  

8mm   coach screws in plugs 

P.C. Board 

Side view 

Ensure that the m otor is m ounted level  

SECURING  THE MOTOR TO TH E FOUNDATION PLATE 

Nut Applicator.  

Insert the nut into the applicator 

Place the nut on the bolt  

Tighten the nut with a spanner. 

Summary of Contents for Compact 300

Page 1: ...28 COMPACT 300 500 OWNERS MANUAL Please read carefully before installing the motor...

Page 2: ...ndications 25 External L E D 26 Warranty 26 Specifications 27 Installers details 27 INDEX 27 COMPACT 500 COMPACT 300 Intended use Domestic Domestic Max gate mass 500 kg 300 kg Max gate length 8m 8m Ma...

Page 3: ...e riskof the gate striking an object Note The installation of beams does not guarantee against the gate striking an object in its path while moving Never allow children to play on or near any automati...

Page 4: ...ht of the gate 25 L E D INDICATIONS There are several light emitting diodes L E Ds on the main P C Board These L E Ds indicate several conditions These indications are as follows STAUS LED ON gate ope...

Page 5: ...e the gate Transformer Reduces 220volts to 16 volts Test button trigger Button to operate the gate from the P C Board Used during programming ABOUT OVER CURRENT When the gate is movingand it strikes a...

Page 6: ...pictures The Compact 500 is shown with the battery removed The foundation plate base gearbox electric motor battery P C Board and the lid are all shared parts by both motors The Compact 500 and the C...

Page 7: ...set is placed inside the house office and the gate sta tion is placed at the point of entry this is normally at the gate The gate station is normally mounted by means of a gooseneck It is important to...

Page 8: ...may lead to the gate jamming This may lead to motor over current or blowingfuses The rail should be above ground level SITE EVALUATION Keepall trees branches bushes and other growthclear of the gate...

Page 9: ...eafter this reduces the chance of the gate closing on an object Although the Compactmotor is designed to be used in a domestic application only this function is available To set multi user mode place...

Page 10: ...he remotes have beenerased from the receiver ERASING A SINGLE REMOTE FROM THE RECEIVER To erase one single remote from the receiver the remotes need to be numbered in order of programming This means t...

Page 11: ...iece of electronic equipment All electronic equipment should be handled with care Never connect or remove wires ona P C Board while there is power on the boardas this may lead to damage Never touch th...

Page 12: ...LUE WIRE BLACK WIRE BLUE WIRE BLACK WIRE Closing direction Closing direction The following diagrams show the correct wiring of the electric motor to the main P C Board The motor wiresare found protrud...

Page 13: ...t be adjusted to allow a 2mm gap between the pinion gear and the rack The best way of doing this is by dropping the motor 2mm on the bolts Push the gate open and closed by hand toensure that the racki...

Page 14: ...the foundation plate Use 8 mm coach screws to mount the foundation plate to the concrete Dig a hole about 300mm square 1 Top view Foundation plate Gate Side view Foundation plate 35mm ANCHORING THE MO...

Reviews: