![cytiva Sterile Tube Fuser Operating Instructions Manual Download Page 45](http://html1.mh-extra.com/html/cytiva/sterile-tube-fuser/sterile-tube-fuser_operating-instructions-manual_2706957045.webp)
Stage
Description
4
The Tubing holders slide the cut tubing into alignment. The hot cutting
blade is held against the cut tubing to ensure sterility.
5
The cutting blade returns to the start position and the tubing is simulta-
neously pushed together to form the connection.
6
The connected tubing is removed and the used cutting blade and cut
tubing ends are discarded.
Prior to use
Prior to use, the instrument should be tested by making a few trial welds which should
be examined. If the sample welds are not acceptable, contact Service.
5 Operation
5.2 Sterile Tube Fuser - Dry
5.2.1 Operational overview
Sterile Tube Fuser - Dry and Hot Lips Tube Sealer Operating Instructions 28964139 AG
45