MB2100-01A-E Single Port Embedded Emulator Debugger SPEED-BOX Operation Guide, Doc. # 002-05542 Rev. *A
19
3.
Operating Procedures
3.1
Power on and power off procedures
This product supports hot plugging of both the debug interface cable and the USB connector.
Although there is no strict power on or power off procedures, the following procedures are
recommended.
■
Power-on procedure (standard operation)
1. Connect the SPEED-BOX with the power switch off to the host computer using the mini USB
cable.
2. Connect the user system with the power disconnected to the SPEED-BOX using the debug
interface cable.
3. Turn on the SPEED-BOX power switch.
4. Start SOFTUNE Workbench and select [Debug] -> [Start Debugging] to start the process of
connecting the debugger.
5. When one of the dialogs shown in Figure 3-1 on the SOFTUNE Workbench is displayed, turn on
the user system. The dialog may vary depending on versions of the SOFTUNE Workbench. If a
different dialog appears, refer to each documentation for SOFTUNE Workbench.
Figure 3-1. Dialog box display
6. Press the [OK] button on the dialog shown above after the power-on reset of the user system
has been released.