
33
Copyright (C) 2011-2012 Reserved by Cypress Semiconductor Corporation
GX3 EEPROM Programming User Guide
The Windows Production Test program supports 6 test items.
1.
PING Test
This test will run the Ping Test with Server PC.
2.
1000Mbps Full-Duplex Test
This test will let network auto-negotiates at 1000Mbps Full-Duplex, and then starts
sending packets to test server. Every packet received from test server will be compared.
3.
100Mbps Full-Duplex Test
This test will let network auto-negotiates at 100Mbps Full-Duplex, and then starts
sending packets to test server. Every packet received from test server will be compared.
4.
100Mbps Half-Duplex Test
This test will let network auto-negotiates at 100Mbps Half-Duplex, and then starts
sending packets to test server. Every packet received from test server will be compared.
5.
10Mbps Full-Duplex Test
This test will let network auto-negotiates at 10Mbps Full-Duplex, and then starts
sending packets to test server. Every packet received from test server will be compared.
6.
10Mbps Half-Duplex Test
This test will let network auto-negotiates at 10Mbps Half-Duplex, and then starts
sending packets to test server. Every packet received from test server will be compared.
7.
EEPROM Program
This test will program EEPROM content, and then read EEPROM to verify.
After starting each of above test items, if the result of current test item is failed, the test will
be stopped.