CyBi
®
-Well
Release:
09/2008
29
Initial
Start-Up
&
Routine
Start-Up
Procedure
6
Initial Start-Up & Routine Start-Up Proce-
dure
6.1
Site Requirements
6.1.1
Installation Requirements
The
room
which
is
selected
for
installation
of
the
CyBi
®
-Well
pipetting
machine
must
meet
the
following
environmental
requirements:
Temperature
range:
+15°C
to
+35°C
Permissible
relative
air
humidity:
≤
75%
at
35
°C,
non-condensing
The
atmosphere
inside
the
installation
room
should
be
dust-free
to
a
maximum
possible
degree,
free
from
drafts
and
free
from
etching
vapors.
Smoking
in
the
installation
room
is
prohibited.
For
pipettor
site
selection,
the
following
rules
should
be
observed:
The
installation
room
must
have
a
stable,
horizontal,
dry
and
vibration-free
floor.
Do
not
install
the
system
directly
beside
doors
or
windows
and
not
in
the
vicinity
of
electro-magnetic
sources
of
interferences.
Prevent
direct
exposure
of
the
system
to
sunlight
and
radiation
emitted
by
heat-
ers.
Make
sure
the
room
is
air
conditioned
if
found
necessary
for
normal
opera-
tion.
Provide
easy
accessibility
of
all
pipettor
parts
at
all
times
and
do
not
obstruct
ven-
tilation
slots
by
other
equipment
parts
or
fixtures
placed
on
or
before
such
inlet/
outlet
positions.
6.1.2
Footprint Requirements
Footprint
requirements
follow
from
the
dimensional
details
and
the
type
of
selected
transporting
system
(
→
Refer to “Technical Data” on page 5.
).
You
should
also
provide
adequate
space
for
the
PC,
monitor,
printer
and
other
required
supplementary
units.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com