5
Copyright © 2013 CyberPower Systems, Inc.
Vertical Installation Guide
Note:
UPS and Battery Pack have to combine together to implement the vertical
installation.
Use the provided Bracket Mounting Screws (2) to connect the Metal Plate with
Expansion Piece. Then use another four Bracket Screws to attach the Mounting
Brackets (2) to the Expansion Metal Plate.
Secure the Rubber Buffer (4) as the base of the Battery Pack using the supplied
Rubber Buffer Screws (4).
Combine the UPS and Battery Pack and fit into the Expansion Metal Plate