background image

1

Model Included:

 

  GEMTS

CAUTION: DO NOT 

connect this brewer to hot 

water. The inlet valve is 

not rated for hot water.

CAUTION: Please use 

this setup procedure 

before attempting to use 

this brewer. Failure to follow the 

instructions can result in injury or the 
voiding of the warranty.

IMPORTANT: Equipment 

to be installed to comply 

with applicable federal, 

state, or local plumbing/electrical 

codes having jurisdiction.

ISO 9001:2008

Wilbur Curtis Co., Inc.

Montebello, CA 90640

Tel: (323) 837-2300

www.wilburcurtis.com

W

ilbur

 C

urtis

 C

o

., i

nC

.

Service Manual – GEMTS

This Curtis Generation 3 Unit is Factory Pre-Set and Ready to Go Right from the Box.

Following are the Factory Settings for your G3 Coffee Brewing System:

 

• Brew Temperature = 200°F   

• Water Bypass = On for LARGE & MEDIUM Brew Only

 

• Brew Volume = Set to Vessel Requirement.

System Requirements:

 

• Water Source   20 – 90 PSI (Minimum Flow Rate of 1 GPM)

 

• Electrical: See attached schematic for standard model or visit www.wilburcurtis.com for your model. 

This equipment is designed for commercial use. Any servicing other than cleaning and routine maintenance 

should be performed by an authorized Wilbur Curtis Company Service Technician.

  •   DO NOT immerse the unit in water or any other liquid
  •   To reduce the risk of fire or electric shock, DO NOT open service panels. There are no user serviceable  

    parts inside. 

  •   Keep hands and other items away from hot areas of the unit during operation.
  •   Never clean with scouring powders or harsh chemicals.

Symbols:

WARNINGS – To help avoid personal injury
Important Notes/Cautions – from the factory

Sanitation Requirements

NSF International requires the following water connection:

1.  A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) is required so 

that the unit can be moved for cleaning.

2.  This unit must be installed with adequate backflow protection to comply with applicable federal, 

state and local codes.

3.  Water pipe connections and fixtures directly connected to a portable water supply shall be sized, 

installed and maintained in accordance with federal, state, and local codes.

3. Connect the unit to electrical outlet with appropriate amperage rating (see serial tag on machine).

4. Once power has been supplied to the unit, flip the toggle switch to the ‘ON’ position (located on the rear of 

the unit), the water tank will begin to fill. When the water level in the tank reaches the probe, the heating 

element(s) will turn on. 

5.  Water in the heating tank will require approximately a half hour before reaching operating temperature 

(factory setting of 200°F). Where applicable, turn on the Universal Control Module (UCM). When the unit 

reaches operating temperature, it will display “READY TO BREW”.

NOTE: A water filtration system must be used to help maintain trouble-free operation. 

Air must be 

purged from the cartridge prior to connection to equipment.

 In areas with extremely hard water, 

we highly recommend the use of a Curtis approved water filter. For our full line of filters, please log 

on to www.wilburcurtis.com.

SETUP STEPS

1.  The unit should be level (left to right - front to back), on a secure surface.  
2.  Connect the water line to the water inlet fitting on the rear of the unit. Water volume flow to the machine 

should be consistent. Use tubing sized sufficiently to provide a minimum flow rate of one gallon per minute.

Important Safeguards/Symbols

Summary of Contents for GEMTS

Page 1: ...equirements NSF International requires the following water connection 1 A quick disconnect or additional coiled tubing at least 2x the depth of the unit is required so that the unit can be moved for c...

Page 2: ...t point temperature of 200 F Control will display when temperature reaches the set point 200 F unit is at brewing temperature Brewing Instructions 1 Brewer should be ON Confirm at rear toggle switch t...

Page 3: ...rogram Menu Tree All programming selections are performed with the three center buttons The symbols below the buttons are Scroll LEFT SELECTION or ENTER to save new parameter Scroll RIGHT IMPORTANT NO...

Page 4: ...ct or to select desired setting CBL 5 15 or OFF to set The Cold Brew Lock feature allows the brewer to brew at three different temperature levels from the actual set point The first setting is within...

Page 5: ...me Factory settings LARGE 5min 25sec MEDIUM 3min 32sec SMALL 1min 52sec Next item in the sequence is Brew by Time Press to Select to change the brew time Display will now show the current time By pres...

Page 6: ...le Milano Twin Milano Single Gemini Twin IF Gemini Single IF Tpro 1Gal Twin and Tpro 1Gal Sngl Press to set When the Model Select feature is changed all settings are reset to the defaults of the newly...

Page 7: ...7 1 2 3 4 5 6 7 8 9 10 12 13 5 15 16 17 18 26 27 28 29 30 31 22 19 20 21 23 14 11 24 25 32 Illustrated Parts...

Page 8: ...LABEL UCM OVERLAY DUAL TWIN LABEL CONTL PANEL 3 BATCH LABEL CONTL PANEL 2 BATCH LABEL CONTL PANEL 1 BATCH KIT UCM CONTROL MODULE RELAY SOLIDSTATE 40A W HT SNK FAUCET HOT WATER DECK ASSY NO HEATING ELE...

Page 9: ...1 8 SHIELD 8 INCH GAUGE GLASS GAUGE GLASS 8 INCH WASHER SHIELD BASE 3 16 FAUCET S NON LOCKING FAUCET ESP BLACK NON LOCKING PLASTIC KIT FAUCET S SERIES SHANK FAUCET W SHIELD BASE KIT SHANK ASSY FAUCET...

Page 10: ...10 Electrical Schematic...

Page 11: ...lean the gauge glass tube and the two washers with a gauge brush and detergent solution Rinse with clear water Dry the parts and assemble them onto the Satellite DO NOT immerse the Satellite in water...

Page 12: ...all local electrical mechanical and plumbing codes 3 Improper voltage Equipment must be installed at the voltage stated on the serial plate supplied with this equipment 4 Improper water supply This in...

Reviews: