background image

Your Curtis ADS System is Factory Pre-Set for Optimum Performance.

After connection to water and power; the rear toggle switch must be on. You will hear a beep sound, indicating power is available to the controller. 

The control displays   

     . Press ON/OFF button and the screen will display   

     .  After three seconds,  

            is displayed. 

Water will fill the tank (approximately 2-3 minutes depending on water flow rate). When the proper level is reached 

              will appear on the screen. 

It takes approximately 20 minutes to reach setpoint temperature of 200°F.

Control will display   

   when temperature reaches the setpoint (200°F). Unit is now ready to brew.

GEM TN

PROGRAM MENUS

All programming selections are performed with the three center buttons. 

The symbols below the buttons are:

      

      

Scroll LEFT

 

 

SELECTION or ENTER to save new parameter

 

  Scroll RIGHT

IMPORTANT NOTE:

2

Reviews: