CAB INSTALLATION
4 of 28
STEP 1: (VEHICLE PREP)
1.1
If tractor is equipped with a 100LC Loader, rotate loader
valve hose loop up per figures 1.1a and 1.1b.
Tools required
22mm Wrench or Socket
1.2
Remove and position the loader (if installed) away from
the vehicle.
1.3
Remove and set aside the ROPS mounted tool box and
bracket along with its fasteners, if equipped. See fig. 1.3
Tools required
12mm Wrench or Socket
1.4
Remove and set aside the SMV sign and its bracket.
See Figures 1.4.
Tools required
13mm Wrench and Socket
1.5
Remove outside ROPS hardware found on both sides of
the tractor and set aside. See figure 1.5.
Tools required
19mm Wrench or Socket
1.6
Remove tail lights from factory mounts per figure 1.6.
Note: you do not need to disconnect the lights.
Tools required
17mm Wrench or Socket
Fig. 1.3 (Remove ROPS mounted Tool Box)
Fig. 1.1a & 1.1b (Rotate Hose Loop)
Rotate Loop
Up
To Here
Fig. 1.5 (Outboard ROPS Fasteners)
Remove outside
ROPS Hardware
Fig. 1.6 (Tail Lights)
Slide light backwards
from mounts
Fig. 1.4 (Remove SMV Sign Bracket)
Set Aside