
20
21
11
5
12
1
10
9
8
15
14
60
MECHANICAL INSTALLATION
Our product is designed in a manner operating with different hardware and peripheral
devices. Prior to start with mechanical installation procedure, please read all assembly
instructions, and abide relevant instructions.
Before starting the assembly work, please ensure that:
• it is within the required operating limits by checking the weights of leaves (considering
the doors which exceed 100kg, please assemble 2 wheeled carrier for each leaf.)
• the wall or structure where the product is mounted conformable with regulations,
• the wall which supports the product is flat, smooth, and vertical to the ground.
13
3
7
6
4
2
1. Microprocessor Control Unit
2. Safety Photocell (Receiver - Transmitter)
3. Motor with Encoder
4. Radar Movement Sensor
5. Position Switch
6. Power Button
7. Belt
8. Double Carrier Roller
9. Stopper
10. Side Covers
11. Idle Roller
12. Belt Coupling Piece
13. Frame
14. Frame Top Cover
15. Motor Drum
CSD 150
AUTOMATIC SLIDING
Summary of Contents for CSD 150
Page 1: ...CSD 150 AUTOMATIC SLIDING USER S MANUAL ...
Page 14: ...26 27 NOTLAR NOTLAR ...
Page 15: ...28 ...