7. Installation
72
PNEG-250
Pan Feeders
7. The drop cable nearest the winch assembly is to be installed and used as the control cable as
. Install the control mounting channel to the ceiling using the two (2) clamps
provided. Mount the clamps approximately 1' from each end of channel. The channel must be
mounted with the open end down. Mount the channel in close proximity to main cable run without
creating interference.
8. Mount one drop pulley at each end of channel. The drop line end pulley must be at least 24" from
end of channel for installation purposes.
9. Mount the overhead control box to the channel using channel clips and wing nuts supplied in the
hardware bag. The box must be mounted with end marked “UP” towards the point where the control
cable will attach to the main cable.
10. Mount the up and down micro switches to the control channel using remaining clips and wing nuts.
THE ACTIVATOR ARMS ON THE SWITCHES MUST POINT TOWARDS THE END OF THE
CONTROL CHANNEL.
Figure 7DN
Control Cable Installation
1. Clamp one end of control cable to main line approximately 24" back towards winch from drop pulley
as shown in
.
2. Insert the cable through cable clamp switch block and then other cable clamp as shown in
. Do not tighten switch block cable clamps at this time.
3. Run drop cable through control channel and drop end drop pulley and then attach to the feeder line.
Be sure that cable does not interfere with switch actuator arms when in operation.
4. Insert switch block into control channel being careful to move switch activator arm down so as not
to damage it.
Figure 7DO
Summary of Contents for Hi-Lo
Page 1: ...PNEG 250 Hi Lo and PRO 1 Pan Feeder Installation and Operation Manual PNEG 250 Date 12 02 09 ...
Page 2: ...2 PNEG 250 Pan Feeders ...
Page 36: ...7 Installation 36 PNEG 250 Pan Feeders Program Chart Figure 7AZ ...
Page 37: ...7 Installation PNEG 250 Pan Feeders 37 Figure 7BA ...
Page 38: ...7 Installation 38 PNEG 250 Pan Feeders Figure 7BB ...
Page 39: ...7 Installation PNEG 250 Pan Feeders 39 Figure 7BC ...
Page 40: ...7 Installation 40 PNEG 250 Pan Feeders Figure 7BD ...
Page 41: ...7 Installation PNEG 250 Pan Feeders 41 Figure 7BE ...
Page 60: ...7 Installation 60 PNEG 250 Pan Feeders Figure 7CQ ...
Page 80: ...9 Parts List 80 PNEG 250 Pan Feeders Hi Lo End Control and Drive Mount 7100113 ...
Page 82: ...9 Parts List 82 PNEG 250 Pan Feeders Micro Switch Center House Control Pan 7101534 ...
Page 84: ...9 Parts List 84 PNEG 250 Pan Feeders Micro Switch End Control Pan 7101482 ...
Page 90: ...9 Parts List 90 PNEG 250 Pan Feeders Feed Level Control Switch 7051400 ...
Page 92: ...9 Parts List 92 PNEG 250 Pan Feeders Flex Flo Hopper Level Control Assembly ...
Page 94: ...9 Parts List 94 PNEG 250 Pan Feeders Flex Flo Level Control Switch FLX 3802 ...
Page 96: ...9 Parts List 96 PNEG 250 Pan Feeders Winching and Miscellaneous Accessories ...
Page 98: ...9 Parts List 98 PNEG 250 Pan Feeders Winching and Miscellaneous Accessories Continued ...
Page 102: ...9 Parts List 102 PNEG 250 Pan Feeders Winch Assembly Parts ...
Page 106: ...9 Parts List 106 PNEG 250 Pan Feeders Switch Box E170 A1007 ...
Page 108: ...108 PNEG 250 Pan Feeders 10 Wiring Diagram Rooster Power Winch Wiring Diagram ...