Index
119
Cat. No. 01023095
PLC Outputs Available
Plumbing Installation
Power On Mode, Set Up
Power Up Mode
Prefilter Cartridge Replacement
Pre-Installation Recommendations
Prepare the Equipment for Clean-
Pressure Switch, Low
Pressure Transducers
Pressurized Storage Tank
Pretreatment Lockout
Process, Two-pass RO
Product Assembly, 208-230V/ 60
Product Assembly, 220V/ 50 Hz,
International
Product Flow Calculations
Product Water Connections
Program Input Acceptance
Programming, GROC
Programming Mode Timeout
PS Sw Delay
PUMP PRESSURE HIGH
PUMP PRESSURE LOW
Q
Quality Flush
QUALITY FLUSH
Quick Programming Chart—First
Time Setup with Flow Trig-
ger Flush
Quick Programming Guide—First
Time Setup with Modem in
R
Recommended membrane clean-
Recovery
RECOVERY RATE HIGH
RECOVERY RATE LOW
Rejection
REJECTION RATE LOW
Relay Mode Settings
Remote Communication on Main
Screen, Wireless
Remote Communication, Set Up
Remote Communication, Wire-
Remote Display Assembly, 208-
Remote Display Assembly, 220V/
Remote Display Assembly Parts
List, 208-230V/ 60 Hz, U.S.
Remote Display Assembly Parts
List, 220V/ 50 Hz, Interna-
Remote, Installing the Modem In
Remote, Wireless
Replacement, Membrane
Replacing the Prefilter Cartridge
Rerun First Time Setup
Reverse Osmosis
Reverse Osmosis System Report
from GBE RO Controller
RF board
RF Board
RO Installation
RO Module Tubing
RS 232 Outputs Available
RS 485 Outputs Available
Running, Go To
S
Select Language
Send a Test Message from the
GBE RO Controller
Serial Numbers
Series M2 International
Series M2 International Specifica-
Series M2 Major Components and
Water Connections, 208-
Series M2 Major Components and
Water Connections, 220V/
Set the COM Properties
Settings for a Two-Pass RO, Infor-
Settings, Information
Settings, Multi-RO Unit
Settings (on Remote), GBE RO
Controller Modem
Settings, Other First Time Setup
Settings, Relay Mode
Settings, TDS Probe
Settings, Time/Date
Setting Up Date and Time
Setup
Set Up Clock Type and Time
Setup, Completed First Time
Set Up, First Time
Set Up Float Switches
Setup From Remote Display, Mo-
dem
Setup, GBE RO Controller Modem
Setup, GBE-Wireless Communica-
tion
Set Up GROC-Remote Communi-
Set Up Power On Mode
Setup, Rerun First Time
Setup, System
Set Up System Status at Startup
Set Up Time/Date
Set Up Units of Measure